Difference between revisions of "Marsa LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
=== Brief Description === | === Brief Description === | ||
* A small onshore plant designed primarily to supply the bunkering market | * A small onshore plant designed primarily to supply the bunkering market | ||
+ | * The plant will be 100% electrically driven and supplied with solar power, which means that GHG intensity will be below 3 kg CO2e/boe. (typically 35 kg CO2e/boe). | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 1 x 165,000 m3 LNG tank |
− | * Constructor: | + | * Constructor: |
+ | ** Technip Energies: Engineering, Procurement and Construction (EPC) of the natural gas liquefaction train | ||
+ | ** CB&I: Engineering, Procurement and Construction for the LNG tank | ||
* Licensor: | * Licensor: | ||
Line 29: | Line 32: | ||
=== Links === | === Links === | ||
− | # | + | # [https://lng-news.blogspot.com/2024/04/oman-totalenergies-launches-marsa-lng.html Oman: TotalEnergies launches the Marsa LNG project and deploys its multi-energy strategy in the Sultanate of Oman] |
+ | # [https://lng-news.blogspot.com/2024/04/technip-energies-awarded-substantial.html Technip Energies Awarded a Substantial Contract for TotalEnergies and OQ’s Marsa LNG Project in Oman] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:Oman]] | [[category:Oman]] | ||
[[category:Total]] | [[category:Total]] |
Latest revision as of 15:04, 28 April 2024
Contents
Summary Information
- Ownership: Total 80% / OQ 20%
- Website: https://totalenergies.com/
- Location: Port of Sohar, Oman
- Capacity: 1.0 million tons/annum
- Status: Planned
Brief Description
- A small onshore plant designed primarily to supply the bunkering market
- The plant will be 100% electrically driven and supplied with solar power, which means that GHG intensity will be below 3 kg CO2e/boe. (typically 35 kg CO2e/boe).
Technical Details
- Storage capacity: 1 x 165,000 m3 LNG tank
- Constructor:
- Technip Energies: Engineering, Procurement and Construction (EPC) of the natural gas liquefaction train
- CB&I: Engineering, Procurement and Construction for the LNG tank
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 2028
Suppliers / Customers
- Suppliers: Gas will be supplied by the Mabrouk North-East field
- Customers:
History
- 2024 - Total announces FID and contracts
Other Information
- -