Difference between revisions of "Marine XII Floating LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
* Ownership: ENI
 
* Ownership: ENI
* Website:  
+
* Website: https://www.eni.com/
 
* Location: Congo  
 
* Location: Congo  
* Capacity: million tons/annum  
+
* Capacity: 3.0 million tons/annum  
 
* Status: Under Construction
 
* Status: Under Construction
  
Line 11: Line 11:
 
* The source of the gas is the [[Marine XII Oil and Gas Fields]]
 
* The source of the gas is the [[Marine XII Oil and Gas Fields]]
 
* The first stage will involve Tango FLNG, built in 2017, which has a treatment capacity of approximately 3 million standard cubic meters/day and an LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic meters/year)
 
* The first stage will involve Tango FLNG, built in 2017, which has a treatment capacity of approximately 3 million standard cubic meters/day and an LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic meters/year)
 +
* A second vessel will add 2.4 MTPA (million tons per annum). This is expected to enter operation in 2025
 +
* When fully operational the two vessels will provide volumes in excess of 3 million tons/year (over 4.5 billion cubic meters/year)
  
 
=== Technical Details ===
 
=== Technical Details ===
 
* Storage capacity:
 
* Storage capacity:
* Constructor:
+
* Constructor: Wison Heavy Industry for the construction and installation of a Floating Liquefied Natural Gas (FLNG) unit
 
* Licensor:
 
* Licensor:
  
Line 22: Line 24:
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
 
* Suppliers: [[Marine XII Oil and Gas Fields]]
 
* Suppliers: [[Marine XII Oil and Gas Fields]]
* Customers:
+
* Customers: The [[Snam Piombino Floating LNG Terminal]] is one of the destinations
  
 
=== History ===
 
=== History ===
 
* 2022 - ENI acquires Tango FLNG
 
* 2022 - ENI acquires Tango FLNG
 +
* 2022 - ENI orders a second vessel
 +
* 2023 - ENI officially launches the project
 +
* 2023 - The FLNG vessel was completed
 +
* 2023 - First gas produced
 +
* 2024 - First cargo set sail
  
 
=== Other Information ===
 
=== Other Information ===
Line 32: Line 39:
 
=== Links ===
 
=== Links ===
 
# [http://lng-news.blogspot.com/2022/08/eni-acquires-tango-flng-to-produce-and.html Eni acquires the Tango FLNG to produce and export LNG from the Republic of Congo]
 
# [http://lng-news.blogspot.com/2022/08/eni-acquires-tango-flng-to-produce-and.html Eni acquires the Tango FLNG to produce and export LNG from the Republic of Congo]
 +
# [https://lng-news.blogspot.com/2022/12/eni-launches-second-flng-project-to.html Eni launches a second FLNG project to increase LNG production and export from the Republic of Congo]
 +
# [https://lng-news.blogspot.com/2023/04/eni-inaugurates-congo-lng-project-in.html Eni inaugurates Congo LNG project in the Republic of the Congo]
 +
# [https://lng-news.blogspot.com/2023/10/eni-celebrates-sail-away-of-tango-flng.html Eni celebrates sail away of the Tango FLNG and Excalibur FSU vessels to Congo]
 +
# [https://lng-news.blogspot.com/2023/12/eni-started-gas-introduction-into-tango.html Eni started the gas introduction into Tango FLNG facility, Republic of Congo]
 +
# [https://lng-news.blogspot.com/2024/02/the-president-of-republic-of-congo.html The President of the Republic of the Congo, the Chairman of the Board of Directors of Eni and the CEO of Eni celebrate Congo’s first LNG cargo]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Congo]]
 
[[category:Congo]]
 
[[category:ENI]]
 
[[category:ENI]]

Latest revision as of 08:00, 28 February 2024

Summary Information

  • Ownership: ENI
  • Website: https://www.eni.com/
  • Location: Congo
  • Capacity: 3.0 million tons/annum
  • Status: Under Construction

Brief Description

  • The development will be made in a modular manner, using multiple floating facilities
  • The source of the gas is the Marine XII Oil and Gas Fields
  • The first stage will involve Tango FLNG, built in 2017, which has a treatment capacity of approximately 3 million standard cubic meters/day and an LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic meters/year)
  • A second vessel will add 2.4 MTPA (million tons per annum). This is expected to enter operation in 2025
  • When fully operational the two vessels will provide volumes in excess of 3 million tons/year (over 4.5 billion cubic meters/year)

Technical Details

  • Storage capacity:
  • Constructor: Wison Heavy Industry for the construction and installation of a Floating Liquefied Natural Gas (FLNG) unit
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2023

Suppliers / Customers

History

  • 2022 - ENI acquires Tango FLNG
  • 2022 - ENI orders a second vessel
  • 2023 - ENI officially launches the project
  • 2023 - The FLNG vessel was completed
  • 2023 - First gas produced
  • 2024 - First cargo set sail

Other Information

  • -

Links

  1. Eni acquires the Tango FLNG to produce and export LNG from the Republic of Congo
  2. Eni launches a second FLNG project to increase LNG production and export from the Republic of Congo
  3. Eni inaugurates Congo LNG project in the Republic of the Congo
  4. Eni celebrates sail away of the Tango FLNG and Excalibur FSU vessels to Congo
  5. Eni started the gas introduction into Tango FLNG facility, Republic of Congo
  6. The President of the Republic of the Congo, the Chairman of the Board of Directors of Eni and the CEO of Eni celebrate Congo’s first LNG cargo