Difference between revisions of "Marine XII Floating LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 2: Line 2:
  
 
* Ownership: ENI
 
* Ownership: ENI
* Website:  
+
* Website: https://www.eni.com/
 
* Location: Congo  
 
* Location: Congo  
* Capacity: million tons/annum  
+
* Capacity: 3.0 million tons/annum  
 
* Status: Under Construction
 
* Status: Under Construction
  

Revision as of 06:23, 9 August 2022

Summary Information

  • Ownership: ENI
  • Website: https://www.eni.com/
  • Location: Congo
  • Capacity: 3.0 million tons/annum
  • Status: Under Construction

Brief Description

  • The development will be made in a modular manner, using multiple floating facilities
  • The source of the gas is the Marine XII Oil and Gas Fields
  • The first stage will involve Tango FLNG, built in 2017, which has a treatment capacity of approximately 3 million standard cubic meters/day and an LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic meters/year)
  • when fully operational it will provide volumes in excess of 3 million tons/year (over 4.5 billion cubic meters/year)

Technical Details

  • Storage capacity:
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2023

Suppliers / Customers

History

  • 2022 - ENI acquires Tango FLNG

Other Information

  • -

Links

  1. Eni acquires the Tango FLNG to produce and export LNG from the Republic of Congo