Difference between revisions of "Marine XII Floating LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Ownership: ENI * Website: * Location: Congo * Capacity: million tons/annum * Status: Under Construction === Brief Description === * - === T...")
 
Line 8: Line 8:
  
 
=== Brief Description ===
 
=== Brief Description ===
* -
+
* The development will be made in a modular manner, using multiple floating facilities
 +
* The source of the gas is the [[Marine XII Oil and Gas Fields]]
 +
* The first stage will involve Tango FLNG, built in 2017, which has a treatment capacity of approximately 3 million standard cubic meters/day and an LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic meters/year)
  
 
=== Technical Details ===
 
=== Technical Details ===

Revision as of 06:19, 9 August 2022

Summary Information

  • Ownership: ENI
  • Website:
  • Location: Congo
  • Capacity: million tons/annum
  • Status: Under Construction

Brief Description

  • The development will be made in a modular manner, using multiple floating facilities
  • The source of the gas is the Marine XII Oil and Gas Fields
  • The first stage will involve Tango FLNG, built in 2017, which has a treatment capacity of approximately 3 million standard cubic meters/day and an LNG production capacity of approximately 0.6 million tons per year (about 1 billion standard cubic meters/year)

Technical Details

  • Storage capacity:
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in 2023

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2022 - ENI acquires Tango FLNG

Other Information

  • -

Links

  1. Eni acquires the Tango FLNG to produce and export LNG from the Republic of Congo