Mansuriya Oil Field
Revision as of 11:41, 26 December 2022 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: TPAO * Country: Iraq * Location: Diyala near the Iranian border * Production start: * Partners: Kuwait Energy & TPAO * Type: Gas * Estimated R...")
Summary Information
- Operator: TPAO
- Country: Iraq
- Location: Diyala near the Iranian border
- Production start:
- Partners: Kuwait Energy & TPAO
- Type: Gas
- Estimated Reserves: 4.5 trillion cubic meters
- Production Volume:
+++ Description
- Mansouria is the second important field in Diyala near the Iranian border, This field has the dimensions of 29 kilometers long & 5 kilometers wide which was discovered in 1978, contains 4 wells with a reserve of 4.5 trillion standard cubic metres.
- The design capacity of the gas processing facilities is 110 million standard cubic feet per day (MMSCFD) of product gas.
- The processing facility will include a gas gathering station, gas and condensate separation, a gas sweetening and regeneration unit and a gas dehydration and regeneration unit.
+++ Contractor
- **KBR:** FEED studies and QCSS during the EPC phase for the field’s production and export systems
- **Mott MacDonald:** Detailed engineering and procurement support
+++ History
- 2009 - The field was offered in the first licencing round but there were no bids
- 2010 - The tender was held
- 2011 - TPAO signed a contract with the Iraqi government
- 2012 - KBR awarded FEED contract
+++ Geology
+++ Links