Mangalore Refinery

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Mangalore Refinery & Petrochemicals Ltd
  • Website: http://www.mrpl.co.in/
  • Location: Mangalore, India
  • Capacity: 15.00 million tons/annum & 300,000 bbl/day
  • Nelson Complexity:

Refining Units

  • Atmospheric Distillation Units
  • Vacuum Distillation Units
  • Delayed Coking 60,000 bpd,
  • Petrochemical Fluid Catalytic Cracking unit
  • Heavy Coker Gas Oil Hydro-Treating Unit (CHTU)
  • Naphtha Splitter Unit
  • Hydrocracker
  • Visbreaker
  • Platformer
  • Merox
  • Hydrogen Unit
  • Bitumen Unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • MRPL used to buy about 60 percent of its oil needs or about 150,000 bpd oil from Iran
  • The company has diversifed, due to Iran's political problems
  • Brazil and Mexico have registered to become crude suppliers, with Mexico offering Isthmus Crude Oil and Brazil may sell Roncador Crude Oil , Marlim Crude Oil or Albacora Crude Oil

Products Produced

  • LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil, Sulphur

Projects

Other Information

-

History

  • 1996 - The refinery is commissioned with 3 million tpa capacity
  • 1999 - Refinery capacity increased to 6.0 million tpa
  • 2010 - The nameplate capacity was increased to 11.82 MMTPA from 9.69 MMTPA, following a revamp of the distillation columns
  • 2012 - The capacity increased to 15.0 MMTPA
  • 2014 - The Delayed coker unit is commissioned

Links

  1. Larsen and Toubro Refining References
  2. Refinery Units
  3. Name Plate Capacity Increased, February 18th, 2010
  4. CDU / VDU Revamp Project awarded to Toyo India by Mangalore Refinery and Petrochemicals Ltd., Mangalore, India
  5. India MRPL looks for Mexico, Brazil crude
  6. Toyo-India Awarded Three Consecutive Refinery Projects in India in the Second Quarter of 2009
  7. Production Goes on Stream from Phase-III Project
  8. MRPL Commissions Delayed Coker Unit
  9. [[[Engineers India Refining References]]]
  10. MRPL Phase III, CHT Unit is onstream