Mangala Oil Field
Revision as of 17:05, 17 November 2023 by Abarrelfull (talk | contribs)
Summary Information
- Operator: Cairn
- Country: India
- Location: Rajasthan
- Production start: 2009
- Partners: ONGC - 30%
- Type: Oil
- Estimated Reserves:
- Production Volume:
+++ Description
- Mangala was the largest onshore oil discovery in India in more than 20 years
- The processing facility, is expected to deliver 150,000+ BOPD, will include water treatment and injection, gas production, power generation, fluid gathering and treatment, and crude oil export
- Oil is supplied to Bhogat near Jamnagar via the The Mangala Development Pipeline (MDP)
+++ Contractors
- **Mustang:** front-end engineering design verification, detail engineering, procurement and construction management services
- **Larsen & Toubro:** Construction of 18 well pad structures, detailed engineering and construction of all civil and electromechanical works
+++ History
- 2004 - Mangala field discovered
- 2006 - Mustang Engineering Awarded Engineering Contract
- 2008 - Larsen & Toubro awarded two major contracts for the Construction of Civil works and the Consolidated Construction Works
- 2009 - First production
+++ Geology
+++ Links