=== Description ===
 
=== Description ===
* The Leviathan Field, an estimated 18 trillion cubic feet of natural gas reservoir, is located in the Levantine basin approximately 135Km offshore Hifa, Israel in 1700M water depth.
+
* The Leviathan Field is located in the Israeli EEZ, approximately 130 km off the shores of Haifa. Production is facilitated by 4 subsea wells that are connected, via a subsea manifold and two 120 km long pipelines, to an offshore platform, where all processing of gas takes place. From the platform the gas is piped to shore into the Israeli national grid.
 +
* Gas is supplied to Jordan and Egypt as well as Israel
  
 
=== Contractors ===
 
=== Contractors ===
Line 20: Line 21:
 
* 2010 - Noble Energy Announces Significant Discovery at Leviathan
 
* 2010 - Noble Energy Announces Significant Discovery at Leviathan
 
* 2013 - Noble Energy Announces Increase In Leviathan Resource Estimate to 18 trillion cubic feet
 
* 2013 - Noble Energy Announces Increase In Leviathan Resource Estimate to 18 trillion cubic feet
 +
* 2017 - Final investment decision
 
* 2019 - First gas produced
 
* 2019 - First gas produced
 
* 2020 - Chevron acquires Noble Energy
 
* 2020 - Chevron acquires Noble Energy

Latest revision as of 11:31, 20 March 2023

Summary Information

  • Operator: Chevron
  • Country: Israel
  • Location: Levantine basin
  • Production start:
  • Partners: Noble Energy - 39.66 %, Delek Drilling - 22.67%, Avner Oil Exploration - 22.67%, and Ratio Oil 15%
  • Type: Gas
  • Estimated Reserves: recoverable gross mean resources of 18 trillion cubic feet
  • Production Volume:

Description

  • The Leviathan Field is located in the Israeli EEZ, approximately 130 km off the shores of Haifa. Production is facilitated by 4 subsea wells that are connected, via a subsea manifold and two 120 km long pipelines, to an offshore platform, where all processing of gas takes place. From the platform the gas is piped to shore into the Israeli national grid.
  • Gas is supplied to Jordan and Egypt as well as Israel

Contractors

  • **CIT:** Project management and conceptual engineering
  • **Aker Solutions:** Hydrate Inhibition FEED


History

  • 2010 - Noble Energy Announces Significant Discovery at Leviathan
  • 2013 - Noble Energy Announces Increase In Leviathan Resource Estimate to 18 trillion cubic feet
  • 2017 - Final investment decision
  • 2019 - First gas produced
  • 2020 - Chevron acquires Noble Energy

Geology

  • Noble encountered 220 feet (67 meters) of net natural gas pay in several subsalt Miocene intervals.

Links

  1. Aker Solutions Hydrate Inhibition References
  2. Noble Energy Announces Successful Leviathan Appraisal Results and Increases Resource Size
  3. Noble Energy Provides Update On Leviathan Deep
  4. Noble Energy Announces Significant Discovery at Leviathan Offshore Israel
  5. Noble Energy Announces Increase In Leviathan Resource Estimate
  6. Chevron Announces Agreement to Acquire Noble Energy
  7. Commencement of the piping of natural gas from the Leviathan reservoir