Difference between revisions of "Le Havre Floating LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 9: | Line 9: | ||
=== Brief Description === | === Brief Description === | ||
* TotalEnergies will deploy the Cape Anne LNG carrier | * TotalEnergies will deploy the Cape Anne LNG carrier | ||
+ | * The Cape Ann will be able to inject up to 5 billion cubic meters of natural gas per year into France’s national network, which is the equivalent of around 60% of the Russian gas imported by France in 2021 and approximately 10% of the country’s annual demand. | ||
=== Technical Details === | === Technical Details === |
Latest revision as of 17:51, 18 February 2023
Contents
Summary Information
- Ownership: Total
- Website:
- Location: Le Havre
- Capacity: million tons/annum
- Status:
Brief Description
- TotalEnergies will deploy the Cape Anne LNG carrier
- The Cape Ann will be able to inject up to 5 billion cubic meters of natural gas per year into France’s national network, which is the equivalent of around 60% of the Russian gas imported by France in 2021 and approximately 10% of the country’s annual demand.
Technical Details
- Storage capacity: 142,000 cubic metres
- Unloading capacity:
- Send out capacity:
- Constructor:
- GRTgaz, which will build and operate the pipeline connecting it to the gas transmission network.
- Technip Energies: Marine Loading Arm
Ongoing Projects/Project Status
- Under construction
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2022 - Technip Energies awarded contract for Marine Loading Arm
- 2023 - French authorities approve the project
Other Information
-