Difference between revisions of "Le Havre Floating LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 3: | Line 3: | ||
* Ownership: Total | * Ownership: Total | ||
* Website: | * Website: | ||
− | * Location: | + | * Location: Le Havre |
* Capacity: million tons/annum | * Capacity: million tons/annum | ||
* Status: | * Status: | ||
+ | |||
=== Brief Description === | === Brief Description === | ||
* TotalEnergies will deploy the Cape Anne LNG carrier | * TotalEnergies will deploy the Cape Anne LNG carrier | ||
Line 11: | Line 12: | ||
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 142,000 cubic metres |
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: |
Revision as of 17:50, 18 February 2023
Contents
Summary Information
- Ownership: Total
- Website:
- Location: Le Havre
- Capacity: million tons/annum
- Status:
Brief Description
- TotalEnergies will deploy the Cape Anne LNG carrier
Technical Details
- Storage capacity: 142,000 cubic metres
- Unloading capacity:
- Send out capacity:
- Constructor:
- GRTgaz, which will build and operate the pipeline connecting it to the gas transmission network.
- Technip Energies: Marine Loading Arm
Ongoing Projects/Project Status
- Under construction
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2022 - Technip Energies awarded contract for Marine Loading Arm
- 2023 - French authorities approve the project
Other Information
-