Laurel Refinery

From A Barrel Full
Revision as of 09:40, 17 February 2020 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Cenex Harvest States Cooperatives CHS * Website: https://www.chsinc.com/ * Location: Laurel, Montana * Capacity: 3.0 million tons/annu...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Ownership: Cenex Harvest States Cooperatives CHS
  • Website: https://www.chsinc.com/
  • Location: Laurel, Montana
  • Capacity: 3.0 million tons/annum & 60,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

-

Refining Units

  • Atmospheric Distillation
  • Diesel Hydrotreating
  • Steam methane reformer

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

Products Produced

  • Propane, gasoline, burner fuel, diesel fuel, asphalt, propane de-asphalted pitch
  • Products are transported on the Cenex Oil Products Pipeline

Projects

-

Other Information

-

History

  • 1943 - CHS acquires the refinery
  • 2005 - A new Ultra Low Sulfur Diesel (ULSD) clean fuels plant was completed
  • 2013 - Project launched to connect the refinery to the Express Oil Pipeline System
  • 2018 - New hydrogen unit commissioned

Links

  1. CHS ULSD Project Laurel, MT
  2. [http://killajoules.wikidot.com/blog:3824 CHS will boost crude oil access with Express Pipeline
  3. New hydrogen plant utilizing TechnipFMC technology in full operation, met performance targets, in Montana