Difference between revisions of "Lake Charles LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Trunkline LNG Company * Website: http://www.panhandleenergy.com/ * Location: Lake Charles, La., USA * Capacity: 13.7 million tons/annum * S...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Ownership: | + | * Ownership: Energy Transfer |
− | * Website: | + | * Website: https://energytransferlng.com/ |
* Location: Lake Charles, La., USA | * Location: Lake Charles, La., USA | ||
* Capacity: 13.7 million tons/annum | * Capacity: 13.7 million tons/annum | ||
Line 34: | Line 34: | ||
* 2006 - Mustang Engineering chosen to Upgrade LNG Facility Using LNG Smart® Air Vaporization Process | * 2006 - Mustang Engineering chosen to Upgrade LNG Facility Using LNG Smart® Air Vaporization Process | ||
* 2011 - Application made for export licence | * 2011 - Application made for export licence | ||
+ | * 2019 - a comprehensive commercial tender package was issued to engineering, procurement and construction (EPC) contractors | ||
+++ Other Information | +++ Other Information | ||
* | * | ||
− | + | === Links === | |
# [http://www.panhandleenergy.com/comp_tlc.asp Terminal Webpage] | # [http://www.panhandleenergy.com/comp_tlc.asp Terminal Webpage] | ||
# [http://www.southernunionco.com/PDF/Export%20Application.pdf Southern Union announces filing of application to export LNG and 1Q results. Click here to view application to export LNG] | # [http://www.southernunionco.com/PDF/Export%20Application.pdf Southern Union announces filing of application to export LNG and 1Q results. Click here to view application to export LNG] |
Revision as of 09:02, 12 January 2022
Summary Information
- Ownership: Energy Transfer
- Website: https://energytransferlng.com/
- Location: Lake Charles, La., USA
- Capacity: 13.7 million tons/annum
- Status: In Operation
+++ Technical Details
- Storage capacity: three LNG tanks with a total capacity of 425,000 cubic meters
- Unloading capacity: flexible docking facilities handle a variety of tanker designs and sizes ranging from 30,000 m3 up to 160,000 m3.
- Send out capacity: When operating at peak capacity, the terminal can regasify LNG and send out natural gas at a maximum rate of 2.1 bcf per day
- Constructor:
- Licensor:
+++ Ongoing Projects/Project Status
- The partners plan construction to turn the import terminal into an export plant
- See [[[Trunkline Lake Charles LNG Export Terminal Project]]]
+++ Suppliers / Customers
- Suppliers: BG Group supplies from its global portfolio
- Customers: The facility is connected to the mainline transmission system of Trunkline Gas Company
+++ History
- 1981 - Terminal construction completed
- 1999 - LNG bought from Qatargas
- 2001 - Phase 1 expansion project launched
- 2004 - Phase 2 expansion project launched
- 2006 - Trunkline LNG completed the Phase II terminal expansion
- 2006 - Mustang Engineering chosen to Upgrade LNG Facility Using LNG Smart® Air Vaporization Process
- 2011 - Application made for export licence
- 2019 - a comprehensive commercial tender package was issued to engineering, procurement and construction (EPC) contractors
+++ Other Information
Links
- Terminal Webpage
- Southern Union announces filing of application to export LNG and 1Q results. Click here to view application to export LNG
- Mustang Engineering to Upgrade Trunkline LNG Facility Using LNG Smart® Air Vaporization Process
- Qatargas Sells Seven Additional LNG Cargoes to United States
- BG and Southern Union reach agreement on a second expansion of Lake Charles LNG terminal