Difference between revisions of "Khursaniyah Gas Processing Plant"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 9: | Line 9: | ||
* The Khursaniyah gas plant includes two gas-conditioning trains, ethane and natural gas liquids recovery units process 1000 MMSCFD of natural gas, produce 550 MMSCFD sales gas, 240,000 BL/D ethane / natural gas liquids, and 1,800 metric tons / day sulfur | * The Khursaniyah gas plant includes two gas-conditioning trains, ethane and natural gas liquids recovery units process 1000 MMSCFD of natural gas, produce 550 MMSCFD sales gas, 240,000 BL/D ethane / natural gas liquids, and 1,800 metric tons / day sulfur | ||
* The plant processes gas from a number of different fields | * The plant processes gas from a number of different fields | ||
− | * NGLs produced here are to be processed at the | + | * NGLs produced here are to be processed at the [[Wasit Gas Processing Plant]] |
++++ Related Oil and Gas Fields | ++++ Related Oil and Gas Fields |
Latest revision as of 13:29, 2 April 2024
Summary Information
- Ownership: Saudi Aramco
- Website: http://www.saudiaramco.com/
- Location: Saudi Arabia
- Capacity: 1000 MMSCFD
+++ Brief Description
- The Khursaniyah gas plant includes two gas-conditioning trains, ethane and natural gas liquids recovery units process 1000 MMSCFD of natural gas, produce 550 MMSCFD sales gas, 240,000 BL/D ethane / natural gas liquids, and 1,800 metric tons / day sulfur
- The plant processes gas from a number of different fields
- NGLs produced here are to be processed at the Wasit Gas Processing Plant
++++ Related Oil and Gas Fields
+++ Contractors
- Bechtel-Technip: Engineering, procurement, construction, commissioning, and startup services
- Saipem: Gas gathering facilities
+++ Ongoing Projects
- -
+++ Other Information
- -
+++ History
- 2005 - Bechtel-Technip Joint Venture awarded contract
- 2008 - Processing facilities completed
- 2012 - Facilities for Karan project came onstream
+++ Relevant Links