Difference between revisions of "Kertih Refinery"
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 30: | Line 30: | ||
1990 - Catalytic Reforming Unit & Naphtha Hydrodesulfurization Unit commissioned | 1990 - Catalytic Reforming Unit & Naphtha Hydrodesulfurization Unit commissioned | ||
=== Links === | === Links === | ||
− | JGC Refinery References | + | # [https://www.petronas.com/our-business/downstream Petronas Downstream] |
− | Chiyoda Catalytic Reforming Units | + | # [[JGC Refinery References]] |
− | Chiyoda Hydrogen Manufacturing Units | + | # [[Chiyoda Catalytic Reforming Units]] |
− | Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U | + | # [[Chiyoda Hydrogen Manufacturing Units]] |
+ | # [[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]] | ||
# [[Toyo Refinery References]] | # [[Toyo Refinery References]] |
Revision as of 06:46, 1 April 2020
Summary Information
Ownership: Petronas Website: http://www.petronas.com.my/ Location: Kertih, Terengganu, Malaysia Capacity: million tons/annum & bbl/day Nelson Complexity: Refining Depth: Brief Description The refinery shares a location with the Kertih Gas Processing Plants It has two distillation trains, one of which is for condensates Refining Units Atmospheric Distillation Catalytic Reforming Unit Naphtha Hydrodesulfurization Unit Hydrogen unit Terminal Capacity Crude Oil: Refined Products: Crude Supply Malaysian light, sweet crude oil Products Produced Gasoline Ongoing Projects - Other Information - History 1983 - Refinery commissioned with 30,000 bpd capacity 1985 - Hydrogen unit commissioned 1990 - Catalytic Reforming Unit & Naphtha Hydrodesulfurization Unit commissioned