Difference between revisions of "Kashima Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: KASHIMA OIL CO Website: http://www.kashima-oil.co.jp/ Location: Capacity: 13,5 million tons/annum & 273,500 bbl/day Nelson Complexity: Refining...")
 
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: KASHIMA OIL CO
+
 
Website: http://www.kashima-oil.co.jp/
+
* Ownership: KASHIMA OIL CO
Location:
+
* Website: http://www.kashima-oil.co.jp/
Capacity: 13,5 million tons/annum & 273,500 bbl/day
+
* Location: Kashima, Japan
Nelson Complexity:
+
* Capacity: 10.0 million tons/annum & 197,000 bbl/day
Refining Depth:
+
* Nelson Complexity:  
Brief Description
+
* Refining Depth:
A large medium complex refinery, producing modern specifcation fuels
+
 
Refining Units
+
=== Brief Description ===
Atmospheric Distillation - 273,500 bpd
+
* A large medium complex refinery, producing modern specifcation fuels
Vacuum Crude Oil Distilltion - 42,000 bpd
+
* The refinery includes a second complex for processing condensate, Kashima Aromatics Company (KAC)
Catalytic Cracking 35,500 bpd
+
 
Catalytic Reforming 22,000 + 8,500 bpd
+
=== Refining Units ===
Naphtha Desulfurizaton 23,000 bpd
+
 
"FCCG Desulfurization" 26,000 bpd
+
* Atmospheric Distillation - 273,500 bpd
Middle Distillate Desulfurization 117,000 bpd
+
* Vacuum Crude Oil Distilltion - 42,000 bpd
Direct Desulfurization 30,000 bpd
+
* Catalytic Cracking 35,500 bpd
Indirect Desulfurization 25,000 bpd
+
* Catalytic Reforming 22,000 + 8,500 bpd
Terminal Capacity
+
* Naphtha Desulfurizaton 23,000 bpd
Crude Oil:
+
* "FCCG Desulfurization" 26,000 bpd
Refined Products:
+
* Middle Distillate Desulfurization 117,000 bpd
Crude Supply
+
* Direct Desulfurization 30,000 bpd
-
+
* Indirect Desulfurization 25,000 bpd
Products Produced
+
 
LPG, naphtha, gasoline, jet fuel, kerosene Diesel, fuel oil, asphalt, sulfur, paraxylene
+
=== Terminal Capacity ===
Ongoing Projects
+
 
The Kashima Refinery Project is designed to increase refining depth and reduce heavy products
+
* Crude Oil:  
Other Information
+
* Refined Products:  
-
+
 
History
+
=== Crude Supply ===
1967 - Application for a petroleum refinery (atmospheric distillation unit of 200,000 BPSD
+
* -
1970 - startup (120,000 barrels / day)
+
 
2003 - Capacity increased to 190,000 barrels / day
+
=== Products Produced ===
2006 - Capacity increased to 200,000 barrels / day
+
* LPG, naphtha, gasoline, jet fuel, kerosene Diesel, fuel oil, asphalt, sulfur, paraxylene
2008 - Benzene / Toluene project completed
+
 
Relevant Links
+
=== Ongoing / Completed Projects ===
Uhde Downstream Oil And Gas Projects
+
* The [[Kashima Refinery Project]] which wass designed to increase refining depth and reduce heavy products was completed in 2015
JGC Refinery References
+
 
Chiyoda Crude Distillation Units
+
=== Other Information ===
Chiyoda Vacuum Flasher Vacuum Distillation Units
+
* -
Chiyoda Catalytic Reforming Units
+
 
Chiyoda Sweetening Units
+
=== History ===
Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
+
* 1967 - Application for a petroleum refinery (atmospheric distillation unit of 200,000 BPSD  
Chiyoda Sour Water Stripping Units
+
* 1970 - startup (120,000 barrels / day)  
Chiyoda H2S Removal Units With Amine
+
* 2003 - Capacity increased to 190,000 barrels / day
 +
* 2006 - Capacity increased to 200,000 barrels / day
 +
* 2008 - Benzene / Toluene project completed and condensate splitter added
 +
* 2010 - Crude oil processing capacity reduced to 252,500 barrels (including 63,500 barrels for KAC)
 +
* 2015 - ROSE unit commissioned
 +
* 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control
 +
* 2017 - Crude oil processing capacity reduced to 197,100 barrels / day (including 35,100 barrels / day for KAC)
 +
 
 +
=== Links ===
 +
# [[Uhde Downstream Oil And Gas Projects]]
 +
# [[JGC Refinery References]]
 +
# [[Chiyoda Crude Distillation Units]]
 +
# [[Chiyoda Vacuum Flasher Vacuum Distillation Units]]
 +
# [[Chiyoda Catalytic Reforming Units]]
 +
# [[Chiyoda Sweetening Units]]
 +
# [[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]]
 +
# [[Chiyoda Sour Water Stripping Units]]
 +
# [[Chiyoda H2S Removal Units With Amine]]
 +
# [https://abarrelfull.blogspot.com/2022/01/execution-of-memorandum-of.html Execution of Memorandum of Understanding regarding Business Integration]
 +
 
 +
[[category:Refinery]]
 +
[[category:Japan]]
 +
[[category:Eneos]]

Latest revision as of 16:46, 25 January 2022

Summary Information

  • Ownership: KASHIMA OIL CO
  • Website: http://www.kashima-oil.co.jp/
  • Location: Kashima, Japan
  • Capacity: 10.0 million tons/annum & 197,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

  • A large medium complex refinery, producing modern specifcation fuels
  • The refinery includes a second complex for processing condensate, Kashima Aromatics Company (KAC)

Refining Units

  • Atmospheric Distillation - 273,500 bpd
  • Vacuum Crude Oil Distilltion - 42,000 bpd
  • Catalytic Cracking 35,500 bpd
  • Catalytic Reforming 22,000 + 8,500 bpd
  • Naphtha Desulfurizaton 23,000 bpd
  • "FCCG Desulfurization" 26,000 bpd
  • Middle Distillate Desulfurization 117,000 bpd
  • Direct Desulfurization 30,000 bpd
  • Indirect Desulfurization 25,000 bpd

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -

Products Produced

  • LPG, naphtha, gasoline, jet fuel, kerosene Diesel, fuel oil, asphalt, sulfur, paraxylene

Ongoing / Completed Projects

  • The Kashima Refinery Project which wass designed to increase refining depth and reduce heavy products was completed in 2015

Other Information

  • -

History

  • 1967 - Application for a petroleum refinery (atmospheric distillation unit of 200,000 BPSD
  • 1970 - startup (120,000 barrels / day)
  • 2003 - Capacity increased to 190,000 barrels / day
  • 2006 - Capacity increased to 200,000 barrels / day
  • 2008 - Benzene / Toluene project completed and condensate splitter added
  • 2010 - Crude oil processing capacity reduced to 252,500 barrels (including 63,500 barrels for KAC)
  • 2015 - ROSE unit commissioned
  • 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control
  • 2017 - Crude oil processing capacity reduced to 197,100 barrels / day (including 35,100 barrels / day for KAC)

Links

  1. Uhde Downstream Oil And Gas Projects
  2. JGC Refinery References
  3. Chiyoda Crude Distillation Units
  4. Chiyoda Vacuum Flasher Vacuum Distillation Units
  5. Chiyoda Catalytic Reforming Units
  6. Chiyoda Sweetening Units
  7. Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
  8. Chiyoda Sour Water Stripping Units
  9. Chiyoda H2S Removal Units With Amine
  10. Execution of Memorandum of Understanding regarding Business Integration