Difference between revisions of "Kashima Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 35: | Line 35: | ||
+++ Ongoing Projects | +++ Ongoing Projects | ||
− | * The | + | * The [[Kashima Refinery Project]] is designed to increase refining depth and reduce heavy products |
+++ Other Information | +++ Other Information | ||
* - | * - | ||
− | + | === History === | |
* 1967 - Application for a petroleum refinery (atmospheric distillation unit of 200,000 BPSD | * 1967 - Application for a petroleum refinery (atmospheric distillation unit of 200,000 BPSD | ||
* 1970 - startup (120,000 barrels / day) | * 1970 - startup (120,000 barrels / day) | ||
Line 46: | Line 46: | ||
* 2006 - Capacity increased to 200,000 barrels / day | * 2006 - Capacity increased to 200,000 barrels / day | ||
* 2008 - Benzene / Toluene project completed | * 2008 - Benzene / Toluene project completed | ||
+ | * 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control | ||
=== Links === | === Links === |
Revision as of 16:29, 25 January 2022
Summary Information
- Ownership: KASHIMA OIL CO
- Website: http://www.kashima-oil.co.jp/
- Location:
- Capacity: 13,5 million tons/annum & 273,500 bbl/day
- Nelson Complexity:
- Refining Depth:
+++ Brief Description
- A large medium complex refinery, producing modern specifcation fuels
+++ Refining Units
- Atmospheric Distillation - 273,500 bpd
- Vacuum Crude Oil Distilltion - 42,000 bpd
- Catalytic Cracking 35,500 bpd
- Catalytic Reforming 22,000 + 8,500 bpd
- Naphtha Desulfurizaton 23,000 bpd
- "FCCG Desulfurization" 26,000 bpd
- Middle Distillate Desulfurization 117,000 bpd
- Direct Desulfurization 30,000 bpd
- Indirect Desulfurization 25,000 bpd
+++ Terminal Capacity
- Crude Oil:
- Refined Products:
+++ Crude Supply
- -
+++ Products Produced
- LPG, naphtha, gasoline, jet fuel, kerosene Diesel, fuel oil, asphalt, sulfur, paraxylene
+++ Ongoing Projects
- The Kashima Refinery Project is designed to increase refining depth and reduce heavy products
+++ Other Information
- -
History
- 1967 - Application for a petroleum refinery (atmospheric distillation unit of 200,000 BPSD
- 1970 - startup (120,000 barrels / day)
- 2003 - Capacity increased to 190,000 barrels / day
- 2006 - Capacity increased to 200,000 barrels / day
- 2008 - Benzene / Toluene project completed
- 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control
Links
- Uhde Downstream Oil And Gas Projects
- JGC Refinery References
- Chiyoda Crude Distillation Units
- Chiyoda Vacuum Flasher Vacuum Distillation Units
- Chiyoda Catalytic Reforming Units
- Chiyoda Sweetening Units
- Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
- Chiyoda Sour Water Stripping Units
- Chiyoda H2S Removal Units With Amine
- Execution of Memorandum of Understanding regarding Business Integration