Difference between revisions of "Kaombo Twin FPSOs"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Name: * Field: Kaombo Oil And Gas Fields * Country: Angola * Ownership: Total * Website: * Field Operated By: * Capacity: 115,000 bpd * Year of...") |
Abarrelfull (talk | contribs) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Name: | + | * Name: Kaombo Norte and Kaombo Sul |
− | * Field: [[Kaombo Oil | + | * Field: [[Kaombo Oil and Gas Fields]] |
* Country: Angola | * Country: Angola | ||
* Ownership: Total | * Ownership: Total | ||
Line 8: | Line 8: | ||
* Field Operated By: | * Field Operated By: | ||
* Capacity: 115,000 bpd | * Capacity: 115,000 bpd | ||
− | * Year of Completion: | + | * Year of Completion: 2018/2019 |
− | + | === Brief Description === | |
− | * The two converted FPSO units, | + | * The two converted FPSO units, each have an oil treating capacity of 115,000 barrels per day, a water injection capacity of 200,000 barrels per day, a 100 million scfd gas compression capacity and a storage capacity of 1.7 million barrels of oil. |
− | * The vessels | + | * The vessels that were converted were the VLCC, Olympia and VLCC, Antartica |
− | + | === Contractors === | |
* **Saipem:** | * **Saipem:** | ||
− | + | ** Engineering, procurement, conversion of the tankers, fabrication and integration of the topsides of the FPSO units and the installation of the mooring systems | |
− | + | ** Hook-up, commissioning and operations start-up | |
− | + | ** Seven years of operation and maintenance services for the FPSO units. | |
* **Sembawang Shipyard:** | * **Sembawang Shipyard:** | ||
− | + | ** Refurbishment of the VLCCs, construction engineering, the fabrication of flare, helideck, upper turret and access structure, integration of the topsides modules, lower turret components, and pre-commissioning of the FPSOs | |
* **Alderley:** Design, engineer and fabricate Produced Water Treatment Packages | * **Alderley:** Design, engineer and fabricate Produced Water Treatment Packages | ||
− | + | === Status === | |
− | * | + | * In operation |
− | + | === History === | |
* 2014 - Saipem awarded engineering, procurement, installation and commissioning contract | * 2014 - Saipem awarded engineering, procurement, installation and commissioning contract | ||
+ | * 2018 - Kaombo Norte began production | ||
+ | * 2019 - Kaombo Sul came onstream | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/blog:5111 Saipem: awarded FPSO contracts in Angola worth more than $4 billion] | # [http://killajoules.wikidot.com/blog:5111 Saipem: awarded FPSO contracts in Angola worth more than $4 billion] | ||
# [http://killajoules.wikidot.com/blog:5328 Sembcorp Marine's Sembawang Shipyard Secures Contract Worth About S$600 Million From Saipem SA for the Conversion of Two FPSOs] | # [http://killajoules.wikidot.com/blog:5328 Sembcorp Marine's Sembawang Shipyard Secures Contract Worth About S$600 Million From Saipem SA for the Conversion of Two FPSOs] | ||
# [http://killajoules.wikidot.com/blog:5946 Awarded FPSO Produced Water Treatment Packages] | # [http://killajoules.wikidot.com/blog:5946 Awarded FPSO Produced Water Treatment Packages] | ||
+ | https://abarrelfull.blogspot.com/2023/01/angolas-major-deep-offshore-kaombo.html Angola’s Major Deep Offshore Kaombo Project Comes On Stream] | ||
+ | # [https://abarrelfull.blogspot.com/2023/01/angola-total-launches-full-field.html Angola: Total launches full-field production on Kaombo with the start-up of the second FPSO] | ||
+ | |||
+ | [[category:FPSO]] | ||
+ | [[category:Angola]] | ||
+ | [[category:Total]] |
Latest revision as of 22:25, 23 January 2023
Contents
Summary Information
- Name: Kaombo Norte and Kaombo Sul
- Field: Kaombo Oil and Gas Fields
- Country: Angola
- Ownership: Total
- Website:
- Field Operated By:
- Capacity: 115,000 bpd
- Year of Completion: 2018/2019
Brief Description
- The two converted FPSO units, each have an oil treating capacity of 115,000 barrels per day, a water injection capacity of 200,000 barrels per day, a 100 million scfd gas compression capacity and a storage capacity of 1.7 million barrels of oil.
- The vessels that were converted were the VLCC, Olympia and VLCC, Antartica
Contractors
- **Saipem:**
- Engineering, procurement, conversion of the tankers, fabrication and integration of the topsides of the FPSO units and the installation of the mooring systems
- Hook-up, commissioning and operations start-up
- Seven years of operation and maintenance services for the FPSO units.
- **Sembawang Shipyard:**
- Refurbishment of the VLCCs, construction engineering, the fabrication of flare, helideck, upper turret and access structure, integration of the topsides modules, lower turret components, and pre-commissioning of the FPSOs
- **Alderley:** Design, engineer and fabricate Produced Water Treatment Packages
Status
- In operation
History
- 2014 - Saipem awarded engineering, procurement, installation and commissioning contract
- 2018 - Kaombo Norte began production
- 2019 - Kaombo Sul came onstream
Other Information
- -
Links
- Saipem: awarded FPSO contracts in Angola worth more than $4 billion
- Sembcorp Marine's Sembawang Shipyard Secures Contract Worth About S$600 Million From Saipem SA for the Conversion of Two FPSOs
- Awarded FPSO Produced Water Treatment Packages
https://abarrelfull.blogspot.com/2023/01/angolas-major-deep-offshore-kaombo.html Angola’s Major Deep Offshore Kaombo Project Comes On Stream]