Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: BP * Country: Trinidad and Tobago * Location: 50 miles off the south east coast of Trinidad * Production start: * Partners: * Type: Gas * Est...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: BP | * Operator: BP | ||
* Country: Trinidad and Tobago | * Country: Trinidad and Tobago | ||
Line 9: | Line 9: | ||
* Production Volume: 590 million standard cubic feet a day (mmscfd) - est. | * Production Volume: 590 million standard cubic feet a day (mmscfd) - est. | ||
− | + | === Description === | |
* The Juniper facility will take gas from the **Corallita** and **Lantana** fields located 50 miles off the south east coast of Trinidad in water-depth of approximately 360 feet | * The Juniper facility will take gas from the **Corallita** and **Lantana** fields located 50 miles off the south east coast of Trinidad in water-depth of approximately 360 feet | ||
* The development will consist of a normally unmanned platform together with corresponding subsea infrastructure | * The development will consist of a normally unmanned platform together with corresponding subsea infrastructure | ||
Line 15: | Line 15: | ||
* Gas from Juniper will flow to the Mahogany B hub via a new ten kilometer flowline | * Gas from Juniper will flow to the Mahogany B hub via a new ten kilometer flowline | ||
− | + | === Contractors === | |
* **Technip:** design, detailed engineering, procurement, construction, load out and mechanical completion of topsides, jacket, flowlines, subsea structures and tie-in spools | * **Technip:** design, detailed engineering, procurement, construction, load out and mechanical completion of topsides, jacket, flowlines, subsea structures and tie-in spools | ||
− | + | === History === | |
* 2012 - Front End Engineering and Design (FEED) launched | * 2012 - Front End Engineering and Design (FEED) launched | ||
* 2014 - Final investment decision made | * 2014 - Final investment decision made | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/blog:5369 BPTT ‘s Juniper Project Gets go Ahead] | # [http://killajoules.wikidot.com/blog:5369 BPTT ‘s Juniper Project Gets go Ahead] | ||
# [http://killajoules.wikidot.com/blog:5420 Technip awarded a substantial EPIC contract for the Juniper field offshore Trinidad] | # [http://killajoules.wikidot.com/blog:5420 Technip awarded a substantial EPIC contract for the Juniper field offshore Trinidad] |
Revision as of 14:38, 19 November 2022
Summary Information
- Operator: BP
- Country: Trinidad and Tobago
- Location: 50 miles off the south east coast of Trinidad
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume: 590 million standard cubic feet a day (mmscfd) - est.
Description
- The Juniper facility will take gas from the **Corallita** and **Lantana** fields located 50 miles off the south east coast of Trinidad in water-depth of approximately 360 feet
- The development will consist of a normally unmanned platform together with corresponding subsea infrastructure
- It will include five subsea wells and will have a production capacity of approximately 590 million standard cubic feet a day (mmscfd).
- Gas from Juniper will flow to the Mahogany B hub via a new ten kilometer flowline
Contractors
- **Technip:** design, detailed engineering, procurement, construction, load out and mechanical completion of topsides, jacket, flowlines, subsea structures and tie-in spools
History
- 2012 - Front End Engineering and Design (FEED) launched
- 2014 - Final investment decision made