JAGAL Gas Pipeline
Jump to navigation
Jump to search
Summary Information
- Source: Frankfurt am Oder, Germany
- Destination: Rückersdorf, Germany
- Ownership: Gascade
- Website: https://www.gascade.de/
- Length: 338 kilometres ( miles)
- Capacity: per day
- Status: Operating
Details
- The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with STEGAL Gas Pipeline
- It links the Yamal-Europe pipeline to the German transmission system
History
- 1995 - Construction of the pipeline began
- 1999 - The first gas flows through the pipeline
Other Information
- -