Difference between revisions of "Interconnector Greece - Bulgaria (IGB) Gas Pipeline"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: per day * Status: (Operating/Planned/Under Cons...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Source: | + | * Source: Komotini |
− | * Destination: | + | * Destination: Stara Zagora |
− | * Ownership: | + | * Ownership: ICGB |
− | * Website: | + | * Website: https://www.icgb.eu/ |
− | * Length: | + | * Length: 182 kilometres ( miles) |
− | * Capacity: per | + | * Capacity: 3 bcm per annum |
− | * Status: | + | * Status: Operating |
=== Details === | === Details === | ||
− | * - | + | * The gas interconnector Greece – Bulgaria (project IGB) connects the natural gas transmission network of Greece near the town of Komotini with the Bulgarian transmission network near the town of Stara Zagora. |
+ | * The interconnector has an overall length of 182 km and a technical capacity of 3 bcm per year | ||
+ | * It interconnects with [[Trans-Adriatic Pipeline TAP]] | ||
=== History === | === History === | ||
− | * - | + | * 2022 - Commercial operations started |
=== Other Information === | === Other Information === | ||
Line 20: | Line 22: | ||
=== Links === | === Links === | ||
# [http://killajoules.wikidot.com/blog:1150 ICGB AD and Consortium Penspen Ltd - C&M Engineering S.A Sign Greece Bulgaria Interconnector Contract] | # [http://killajoules.wikidot.com/blog:1150 ICGB AD and Consortium Penspen Ltd - C&M Engineering S.A Sign Greece Bulgaria Interconnector Contract] | ||
+ | # [https://abarrelfull.blogspot.com/2023/11/the-interconnector-with-greece-has.html The interconnector with Greece has successfully started commercial operation] | ||
[[category:Pipeline]] | [[category:Pipeline]] | ||
− | [[category: | + | [[category:Bulgaria]] |
− | [[category: | + | [[category:Greece]] |
Latest revision as of 10:54, 9 November 2023
Summary Information
- Source: Komotini
- Destination: Stara Zagora
- Ownership: ICGB
- Website: https://www.icgb.eu/
- Length: 182 kilometres ( miles)
- Capacity: 3 bcm per annum
- Status: Operating
Details
- The gas interconnector Greece – Bulgaria (project IGB) connects the natural gas transmission network of Greece near the town of Komotini with the Bulgarian transmission network near the town of Stara Zagora.
- The interconnector has an overall length of 182 km and a technical capacity of 3 bcm per year
- It interconnects with Trans-Adriatic Pipeline TAP
History
- 2022 - Commercial operations started
Other Information
- -