IRPC Rayong Refinery

From A Barrel Full
Revision as of 17:26, 9 March 2020 by Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: IRPC Website: http://www.irpc.co.th/ Location: Rayong, Thailand Capacity: 10.75 million tons/annum & 215,000 bbl/day Nelson Complexity: Refining...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information Ownership: IRPC Website: http://www.irpc.co.th/ Location: Rayong, Thailand Capacity: 10.75 million tons/annum & 215,000 bbl/day Nelson Complexity: Refining Depth: Brief Description A large refinery and integrated petrochemical complex Refining Units Atmospheric Distillation 65,000 + 150,000 Vacuum Gas Oil Hydro Treating Unit Lube base plant - 320,000 tons per annum Asphalt plant - 380,000 tons per annum Terminal Capacity Crude Oil: Refined Products: Crude Supply The refinery processes condensate as well as crude Products Produced Gasoline, diesel and LPG Ongoing Projects See IRPC Rayong Refinery Upgrade Project A 30,000 barrels per day deep catalytic cracking (DCC) unit is being constructed The refinery is adding a Tail Gas Treating Unit 1 and Amine Regeneration Unit 2 Other Information - History 2011 - Euro 4 Petrol launched 2011 - Fuel oil usage was eliminated with the CHP unit commissioned 2012 - Shaw awarded contract for DCC Unit 2014 - Small fire in the Vacuum Gas Oil Hydro Treating Unit Relevant Links Uhde Wins Tail Gas Treating Contract in Thailand IRPC opens the Combined Heat and Power Project Fire at IRPC Refinery in Thailand