Difference between revisions of "IRPC Rayong Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 46: | Line 46: | ||
# [http://killajoules.wikidot.com/archive:irpc-started-combined-heat-and-power-project IRPC opens the Combined Heat and Power Project] | # [http://killajoules.wikidot.com/archive:irpc-started-combined-heat-and-power-project IRPC opens the Combined Heat and Power Project] | ||
# [http://killajoules.wikidot.com/blog:5246 Fire at IRPC Refinery in Thailand] | # [http://killajoules.wikidot.com/blog:5246 Fire at IRPC Refinery in Thailand] | ||
+ | # [https://refiningnews.blogspot.com/2021/12/wood-to-drive-refinery-efficiency-on.html Wood to drive refinery efficiency on Ultra Clean Fuel Project] |
Latest revision as of 11:11, 8 December 2021
Contents
Summary Information
- Ownership: IRPC
- Website: http://www.irpc.co.th/
- Location: Rayong, Thailand
- Capacity: 10.75 million tons/annum & 215,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
- A large refinery and integrated petrochemical complex
Refining Units
- [[[Atmospheric Distillation]]] 65,000 + 150,000
- Vacuum Gas Oil Hydro Treating Unit
- Lube base plant - 320,000 tons per annum
- Asphalt plant - 380,000 tons per annum
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The refinery processes condensate as well as crude
Products Produced
- Gasoline, diesel and LPG
Ongoing Projects
- See IRPC Rayong Refinery Upgrade Project
- A 30,000 barrels per day deep catalytic cracking (DCC) unit is being constructed
- The refinery is adding a Tail Gas Treating Unit 1 and Amine Regeneration Unit 2
Other Information
- -
History
- 2011 - Euro 4 Petrol launched
- 2011 - Fuel oil usage was eliminated with the CHP unit commissioned
- 2012 - Shaw awarded contract for DCC Unit
- 2014 - Small fire in the Vacuum Gas Oil Hydro Treating Unit