Difference between revisions of "IRPC Rayong Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: IRPC Website: http://www.irpc.co.th/ Location: Rayong, Thailand Capacity: 10.75 million tons/annum & 215,000 bbl/day Nelson Complexity: Refining...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: IRPC
+
* Ownership: IRPC
Website: http://www.irpc.co.th/
+
* Website: http://www.irpc.co.th/
Location: Rayong, Thailand
+
* Location: Rayong, Thailand
Capacity: 10.75 million tons/annum & 215,000 bbl/day
+
* Capacity: 10.75 million tons/annum & 215,000 bbl/day  
Nelson Complexity:
+
* Nelson Complexity:  
Refining Depth:
+
* Refining Depth:
Brief Description
+
 
A large refinery and integrated petrochemical complex
+
=== Brief Description ===
Refining Units
+
* A large refinery and integrated petrochemical complex
Atmospheric Distillation 65,000 + 150,000
+
 
Vacuum Gas Oil Hydro Treating Unit
+
===  Refining Units ===
Lube base plant - 320,000 tons per annum
+
 
Asphalt plant - 380,000 tons per annum
+
* [[[Atmospheric Distillation]]] 65,000 + 150,000
Terminal Capacity
+
* Vacuum Gas Oil Hydro Treating Unit  
Crude Oil:
+
* Lube base plant - 320,000 tons per annum
Refined Products:
+
* Asphalt plant - 380,000 tons per annum
Crude Supply
+
 
The refinery processes condensate as well as crude
+
===  Terminal Capacity ===
Products Produced
+
 
Gasoline, diesel and LPG
+
* Crude Oil:  
Ongoing Projects
+
* Refined Products:  
See IRPC Rayong Refinery Upgrade Project
+
 
A 30,000 barrels per day deep catalytic cracking (DCC) unit is being constructed
+
===  Crude Supply ===
The refinery is adding a Tail Gas Treating Unit 1 and Amine Regeneration Unit 2
+
* The refinery processes condensate as well as crude
Other Information
+
 
-
+
===  Products Produced ===
History
+
* Gasoline, diesel and LPG
2011 - Euro 4 Petrol launched
+
 
2011 - Fuel oil usage was eliminated with the CHP unit commissioned
+
===  Ongoing Projects ===
2012 - Shaw awarded contract for DCC Unit
+
* See [[IRPC Rayong Refinery Upgrade Project]]
2014 - Small fire in the Vacuum Gas Oil Hydro Treating Unit
+
* A 30,000 barrels per day deep catalytic cracking (DCC) unit is being constructed
Relevant Links
+
* The refinery is adding a Tail Gas Treating Unit 1 and Amine Regeneration Unit 2
Uhde Wins Tail Gas Treating Contract in Thailand
+
 
IRPC opens the Combined Heat and Power Project
+
=== Other Information ===
Fire at IRPC Refinery in Thailand
+
* -
 +
 
 +
=== History ===
 +
* 2011 - Euro 4 Petrol launched
 +
* 2011 - Fuel oil usage was eliminated with the CHP unit commissioned
 +
* 2012 - Shaw awarded contract for DCC Unit
 +
* 2014 - Small fire in the Vacuum Gas Oil Hydro Treating Unit  
 +
 
 +
=== Links ===
 +
# [http://www.uhde-oilandgas.com/News/Oil-Refining-News/Monash-University-Employment-Fair.aspx Uhde Wins Tail Gas Treating Contract in Thailand]
 +
# [http://killajoules.wikidot.com/archive:irpc-started-combined-heat-and-power-project IRPC opens the Combined Heat and Power Project]
 +
# [http://killajoules.wikidot.com/blog:5246 Fire at IRPC Refinery in Thailand]

Revision as of 11:05, 8 December 2021

Summary Information

  • Ownership: IRPC
  • Website: http://www.irpc.co.th/
  • Location: Rayong, Thailand
  • Capacity: 10.75 million tons/annum & 215,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

  • A large refinery and integrated petrochemical complex

Refining Units

  • [[[Atmospheric Distillation]]] 65,000 + 150,000
  • Vacuum Gas Oil Hydro Treating Unit
  • Lube base plant - 320,000 tons per annum
  • Asphalt plant - 380,000 tons per annum

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • The refinery processes condensate as well as crude

Products Produced

  • Gasoline, diesel and LPG

Ongoing Projects

  • See IRPC Rayong Refinery Upgrade Project
  • A 30,000 barrels per day deep catalytic cracking (DCC) unit is being constructed
  • The refinery is adding a Tail Gas Treating Unit 1 and Amine Regeneration Unit 2

Other Information

  • -

History

  • 2011 - Euro 4 Petrol launched
  • 2011 - Fuel oil usage was eliminated with the CHP unit commissioned
  • 2012 - Shaw awarded contract for DCC Unit
  • 2014 - Small fire in the Vacuum Gas Oil Hydro Treating Unit

Links

  1. Uhde Wins Tail Gas Treating Contract in Thailand
  2. IRPC opens the Combined Heat and Power Project
  3. Fire at IRPC Refinery in Thailand