Difference between revisions of "IRPC Rayong Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: IRPC Website: http://www.irpc.co.th/ Location: Rayong, Thailand Capacity: 10.75 million tons/annum & 215,000 bbl/day Nelson Complexity: Refining...") |
Abarrelfull (talk | contribs) (→Links) |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | Ownership: IRPC | + | * Ownership: IRPC |
− | Website: http://www.irpc.co.th/ | + | * Website: http://www.irpc.co.th/ |
− | Location: Rayong, Thailand | + | * Location: Rayong, Thailand |
− | Capacity: 10.75 million tons/annum & 215,000 bbl/day | + | * Capacity: 10.75 million tons/annum & 215,000 bbl/day |
− | Nelson Complexity: | + | * Nelson Complexity: |
− | Refining Depth: | + | * Refining Depth: |
− | Brief Description | + | |
− | A large refinery and integrated petrochemical complex | + | === Brief Description === |
− | Refining Units | + | * A large refinery and integrated petrochemical complex |
− | Atmospheric Distillation 65,000 + 150,000 | + | |
− | Vacuum Gas Oil Hydro Treating Unit | + | === Refining Units === |
− | Lube base plant - 320,000 tons per annum | + | |
− | Asphalt plant - 380,000 tons per annum | + | * [[[Atmospheric Distillation]]] 65,000 + 150,000 |
− | Terminal Capacity | + | * Vacuum Gas Oil Hydro Treating Unit |
− | Crude Oil: | + | * Lube base plant - 320,000 tons per annum |
− | Refined Products: | + | * Asphalt plant - 380,000 tons per annum |
− | Crude Supply | + | |
− | The refinery processes condensate as well as crude | + | === Terminal Capacity === |
− | Products Produced | + | |
− | Gasoline, diesel and LPG | + | * Crude Oil: |
− | Ongoing Projects | + | * Refined Products: |
− | See IRPC Rayong Refinery Upgrade Project | + | |
− | A 30,000 barrels per day deep catalytic cracking (DCC) unit is being constructed | + | === Crude Supply === |
− | The refinery is adding a Tail Gas Treating Unit 1 and Amine Regeneration Unit 2 | + | * The refinery processes condensate as well as crude |
− | Other Information | + | |
− | - | + | === Products Produced === |
− | History | + | * Gasoline, diesel and LPG |
− | 2011 - Euro 4 Petrol launched | + | |
− | 2011 - Fuel oil usage was eliminated with the CHP unit commissioned | + | === Ongoing Projects === |
− | 2012 - Shaw awarded contract for DCC Unit | + | * See [[IRPC Rayong Refinery Upgrade Project]] |
− | 2014 - Small fire in the Vacuum Gas Oil Hydro Treating Unit | + | * A 30,000 barrels per day deep catalytic cracking (DCC) unit is being constructed |
− | + | * The refinery is adding a Tail Gas Treating Unit 1 and Amine Regeneration Unit 2 | |
− | Uhde Wins Tail Gas Treating Contract in Thailand | + | |
− | IRPC opens the Combined Heat and Power Project | + | === Other Information === |
− | Fire at IRPC Refinery in Thailand | + | * - |
+ | |||
+ | === History === | ||
+ | * 2011 - Euro 4 Petrol launched | ||
+ | * 2011 - Fuel oil usage was eliminated with the CHP unit commissioned | ||
+ | * 2012 - Shaw awarded contract for DCC Unit | ||
+ | * 2014 - Small fire in the Vacuum Gas Oil Hydro Treating Unit | ||
+ | |||
+ | === Links === | ||
+ | # [http://www.uhde-oilandgas.com/News/Oil-Refining-News/Monash-University-Employment-Fair.aspx Uhde Wins Tail Gas Treating Contract in Thailand] | ||
+ | # [http://killajoules.wikidot.com/archive:irpc-started-combined-heat-and-power-project IRPC opens the Combined Heat and Power Project] | ||
+ | # [http://killajoules.wikidot.com/blog:5246 Fire at IRPC Refinery in Thailand] | ||
+ | # [https://refiningnews.blogspot.com/2021/12/wood-to-drive-refinery-efficiency-on.html Wood to drive refinery efficiency on Ultra Clean Fuel Project] |
Latest revision as of 11:11, 8 December 2021
Contents
Summary Information
- Ownership: IRPC
- Website: http://www.irpc.co.th/
- Location: Rayong, Thailand
- Capacity: 10.75 million tons/annum & 215,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
- A large refinery and integrated petrochemical complex
Refining Units
- [[[Atmospheric Distillation]]] 65,000 + 150,000
- Vacuum Gas Oil Hydro Treating Unit
- Lube base plant - 320,000 tons per annum
- Asphalt plant - 380,000 tons per annum
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- The refinery processes condensate as well as crude
Products Produced
- Gasoline, diesel and LPG
Ongoing Projects
- See IRPC Rayong Refinery Upgrade Project
- A 30,000 barrels per day deep catalytic cracking (DCC) unit is being constructed
- The refinery is adding a Tail Gas Treating Unit 1 and Amine Regeneration Unit 2
Other Information
- -
History
- 2011 - Euro 4 Petrol launched
- 2011 - Fuel oil usage was eliminated with the CHP unit commissioned
- 2012 - Shaw awarded contract for DCC Unit
- 2014 - Small fire in the Vacuum Gas Oil Hydro Treating Unit