Difference between revisions of "Hyundai Daesan Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | Ownership: Hyundai Oilbank | + | * Ownership: Hyundai Oilbank |
− | Website: http://www.oilbank.co.kr/ | + | * Website: http://www.oilbank.co.kr/ |
− | Location: South Korea | + | * Location: South Korea |
− | Capacity: 32.5 million tons/annum & 650,000 bbl/day | + | * Capacity: 32.5 million tons/annum & 650,000 bbl/day |
− | Nelson Complexity: | + | * Nelson Complexity: |
− | Refining Depth: | + | * Refining Depth: |
=== Brief Description === | === Brief Description === | ||
* A very large, highly complex refinery | * A very large, highly complex refinery | ||
− | Refining Units | + | === Refining Units === |
− | Atmospheric Distillation, 390,000 BPSD | + | * Atmospheric Distillation, 390,000 BPSD |
− | VDU (vacuum distillation unit) 60,000 BPSD | + | * VDU (vacuum distillation unit) 60,000 BPSD |
− | Naphtha reforming unit 26,000 BPSD | + | * Naphtha reforming unit 26,000 BPSD |
− | Kerosene hydro-treating unit 30,000 BPSD | + | * Kerosene hydro-treating unit 30,000 BPSD |
− | Kerosene and Diesel hydro-treating unit 26,000 BPSD | + | * Kerosene and Diesel hydro-treating unit 26,000 BPSD |
− | Diesel hydro-treating unit 58,000 BPSD | + | * Diesel hydro-treating unit 58,000 BPSD |
− | Asphalt cokes (delayed coking unit) 33,000 BPSD | + | * Asphalt cokes (delayed coking unit) 33,000 BPSD |
− | Hydrocracking unit 31,000 BPSD | + | * Hydrocracking unit 31,000 BPSD |
− | Sulfur Recovery Unit 360 Ton/day | + | * Sulfur Recovery Unit 360 Ton/day |
− | Resid Upgrader | + | * Resid Upgrader |
− | Hydrocracking Unit | + | * Hydrocracking Unit |
− | Delayed Coking Unit | + | * Delayed Coking Unit |
− | Hydrogen Manufacturing Unit | + | * Hydrogen Manufacturing Unit |
Terminal Capacity | Terminal Capacity | ||
− | Crude Oil: 5,530,000 BBL | + | * Crude Oil: 5,530,000 BBL |
− | Refined Products: 6,980,000 BBL | + | * Refined Products: 6,980,000 BBL |
B T X (Aromatics) facilities 455,000 Ton/year | B T X (Aromatics) facilities 455,000 Ton/year | ||
− | Crude Supply | + | === Crude Supply === |
- | - | ||
− | Products Produced | + | === Products Produced === |
− | Gasoline, Diesel, LPG, Jet, Bunker fuels. | + | * Gasoline, Diesel, LPG, Jet, Bunker fuels. |
− | Ongoing Projects | + | === Ongoing / Completed Projects === |
− | The Hyundai Daesan Refinery Expansion Project was completed in 2018 | + | * The Hyundai Daesan Refinery Expansion Project was completed in 2018 |
− | Hyundai Daesan Refinery Upgrade Project | + | * Hyundai Daesan Refinery Upgrade Project |
− | Other Information | + | === Other Information === |
- | - | ||
=== History === | === History === |
Revision as of 10:38, 22 March 2021
Contents
Summary Information
- Ownership: Hyundai Oilbank
- Website: http://www.oilbank.co.kr/
- Location: South Korea
- Capacity: 32.5 million tons/annum & 650,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
- A very large, highly complex refinery
Refining Units
- Atmospheric Distillation, 390,000 BPSD
- VDU (vacuum distillation unit) 60,000 BPSD
- Naphtha reforming unit 26,000 BPSD
- Kerosene hydro-treating unit 30,000 BPSD
- Kerosene and Diesel hydro-treating unit 26,000 BPSD
- Diesel hydro-treating unit 58,000 BPSD
- Asphalt cokes (delayed coking unit) 33,000 BPSD
- Hydrocracking unit 31,000 BPSD
- Sulfur Recovery Unit 360 Ton/day
- Resid Upgrader
- Hydrocracking Unit
- Delayed Coking Unit
- Hydrogen Manufacturing Unit
Terminal Capacity
- Crude Oil: 5,530,000 BBL
- Refined Products: 6,980,000 BBL
B T X (Aromatics) facilities 455,000 Ton/year
Crude Supply
-
Products Produced
- Gasoline, Diesel, LPG, Jet, Bunker fuels.
Ongoing / Completed Projects
- The Hyundai Daesan Refinery Expansion Project was completed in 2018
- Hyundai Daesan Refinery Upgrade Project
Other Information
-
History
- 1996 - Capacity expanded to 200,000 bpd
- 2004 - Foster Wheeler Secures Project Management Consultancy Contract for Clean Fuels Upgrade Project
- 2005 - Diesel desulphurisation complex commissioned
- 2018 - Refinery expanded to 650,000 bpd