Hassi Berkine Oil Field

From A Barrel Full
Revision as of 08:54, 14 June 2023 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Operator: Anadarko
  • Country: Algeria
  • Location: Sahara
  • Production start:
  • Partners: Sonatrach
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Gross oil production capacity through the four-train CPF is 285,000 barrels per day

+++ History

  • 1998 - Sonatrach and Anadarko formed a joint-operating association called Groupement Berkine
  • 2001 - Production from stage 2 of Hassi Berkine South launched
  • 2002 - Start-up of the fourth oil production train
  • 2017 - Total acquired a stake with its acquisition of Maersk

+++ Geology

+++ Links

  1. Production Begins From Anadarko's HBNS Stage 2 Facilities in Algeria
  2. Anadarko, Sonatrach and Partners Mark Production Start-Up in Algeria
  3. Total acquires Maersk Oil for $7.45 billion in a share and debt transaction