Difference between revisions of "Hassi Berkine Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Anadarko * Country: Algeria * Location: Sahara * Production start: * Partners: Sonatrach * Type: Oil * Estimated Reserves: * Production Volu...")
 
Line 16: Line 16:
 
* 2001 - Production from stage 2 of Hassi Berkine South launched
 
* 2001 - Production from stage 2 of Hassi Berkine South launched
 
* 2002 - Start-up of the fourth oil production train
 
* 2002 - Start-up of the fourth oil production train
 +
* 2017 - Total acquired a stake with its acquisition of Maersk
  
 
+++ Geology
 
+++ Geology
Line 23: Line 24:
 
# [http://killajoules.wikidot.com/archive:production-begins-from-anadarko-s-hbns-stage-2-facil Production Begins From Anadarko's HBNS Stage 2 Facilities in Algeria]
 
# [http://killajoules.wikidot.com/archive:production-begins-from-anadarko-s-hbns-stage-2-facil Production Begins From Anadarko's HBNS Stage 2 Facilities in Algeria]
 
# [http://killajoules.wikidot.com/archive:anadarko-sonatrach-and-partners-mark-production-star Anadarko, Sonatrach and Partners Mark Production Start-Up in Algeria]
 
# [http://killajoules.wikidot.com/archive:anadarko-sonatrach-and-partners-mark-production-star Anadarko, Sonatrach and Partners Mark Production Start-Up in Algeria]
 +
# [https://abarrelfull.blogspot.com/2022/09/total-acquires-maersk-oil-for-745.html Total acquires Maersk Oil for $7.45 billion in a share and debt transaction]
 +
 +
[[category:Field]]
 +
[[category:Algeria]]
 +
[[category:Total]]
 +
[[category:Sonatrach]]

Revision as of 08:54, 14 June 2023

Summary Information

  • Operator: Anadarko
  • Country: Algeria
  • Location: Sahara
  • Production start:
  • Partners: Sonatrach
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • Gross oil production capacity through the four-train CPF is 285,000 barrels per day

+++ History

  • 1998 - Sonatrach and Anadarko formed a joint-operating association called Groupement Berkine
  • 2001 - Production from stage 2 of Hassi Berkine South launched
  • 2002 - Start-up of the fourth oil production train
  • 2017 - Total acquired a stake with its acquisition of Maersk

+++ Geology

+++ Links

  1. Production Begins From Anadarko's HBNS Stage 2 Facilities in Algeria
  2. Anadarko, Sonatrach and Partners Mark Production Start-Up in Algeria
  3. Total acquires Maersk Oil for $7.45 billion in a share and debt transaction