Hasdrubal Gas Field

From A Barrel Full
Revision as of 18:54, 2 March 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: BG Group * Country: Tunisia * Location: Offshore, Gulf of Gabes * Production start: 2009 * Partners: * BG Group 50%, * Entreprise Tunisienn...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: BG Group
  • Country: Tunisia
  • Location: Offshore, Gulf of Gabes
  • Production start: 2009
  • Partners:
* BG Group 50%, 
* Entreprise Tunisienne d’Activités Pétrolières (ETAP) 50%
  • Type: Gas & condensate
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The Hasdrubal onshore gas processing facility (BG Group 50%, ETAP 50%) and LPG production facility (100% BG Group) have been built adjacent to the Hannibal plant. Gas is sold to STEG while liquids and LPG are exported or sold in the local market.
  • Hasdrubal A platform consists of a 1,000 ton jacket and a 1,500 ton topside

+++ Contractors

  • **Petrofac:** Front-end engineering and design (FEED) for the development of the Hasdrubal field
  • **Heerema:** Engineering, procurement, construction, transportation and installation (EPCI) of the Hasdrubal A platform
  • **Saipem:** Offshore Pipeline installation
  • **Cladtek:** CRA Flowlines
  • **FoundOcean:** Hasdrubal A grouting

+++ History

  • 1975 - The Hasdrubal field was first discovered by Elf
  • 1998 - Successful appraisal wells drilled
  • 2002 - BG finds light oil in the Hasdrubal South West extension
  • 2005 - Petrofac Awarded Hasdrubal Development FEED
  • 2007 - Heerema awarded the engineering, procurement, construction, transportation and installation (EPCI) of the Hasdrubal A platform
  • 2009 - Production began

+++ Geology

+++ Links

  1. BG Group Tunisia
  2. [[[FoundOcean Subsea References]]
  3. Saipem Africa Pipeline References
  4. Oil And Gas Concessions In Tunisia
  5. Petrofac Awarded Hasdrubal Development FEED
  6. BG Tunisia completes successful Hasdrubal SW-1 well
  7. Success For Tunisian Appraisal Well
  8. Construction Hasdrubal platform well under way
  9. Cladtek completes delivery of British Gas Hasdrubal CRA Flowlines