Difference between revisions of "Hasbah Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Saudi Aramco * Country: Saudi Arabia * Location: * Production start: * Partners: * Type: Gas * Estimated Reserves: * Production Vol...") |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 10: | Line 10: | ||
=== Description === | === Description === | ||
− | * | + | * An offshore gas field which is tied back to the [[Karan Gas Field]] |
+ | * Gas is processed at the [[Fadhili Gas Processing Plant]] | ||
=== Contractors === | === Contractors === | ||
− | * - | + | * McDermott: EPCI of Wellhead PDM for four wells, 3.75 miles (6 kilometres) of 16-inch corrosion resistant alloy (CRA) cladded flowline, 4 miles (6.5 kilometres) of subsea umbilical cable, offshore tie-ins to existing facilities and electrical modifications to existing PDMs |
=== History === | === History === | ||
− | * | + | * 2019 - McDermott awarded EPCI contract |
=== Geology === | === Geology === | ||
Line 22: | Line 23: | ||
=== Links === | === Links === | ||
− | # | + | # [https://abarrelfull.blogspot.com/2023/01/mcdermott-awarded-offshore-epci.html McDermott Awarded Offshore EPCI Contract by Saudi Aramco] |
Latest revision as of 13:28, 2 April 2024
Summary Information
- Operator: Saudi Aramco
- Country: Saudi Arabia
- Location:
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- An offshore gas field which is tied back to the Karan Gas Field
- Gas is processed at the Fadhili Gas Processing Plant
Contractors
- McDermott: EPCI of Wellhead PDM for four wells, 3.75 miles (6 kilometres) of 16-inch corrosion resistant alloy (CRA) cladded flowline, 4 miles (6.5 kilometres) of subsea umbilical cable, offshore tie-ins to existing facilities and electrical modifications to existing PDMs
History
- 2019 - McDermott awarded EPCI contract