=== Brief Description ===
 
=== Brief Description ===
 +
* Initially the faility will be a floating terminal, while the permanent structures are being built
 
* A regasification facility with 2 tanks and annual throughput of 8 BCM
 
* A regasification facility with 2 tanks and annual throughput of 8 BCM
 
* Distribution facilities (truck, rail car, LNG bunker barges)
 
* Distribution facilities (truck, rail car, LNG bunker barges)
Line 19: Line 20:
 
* Constructor:
 
* Constructor:
 
* Licensor:
 
* Licensor:
throughput:
 
 
storage capacity:
 
 
 
 
unloading rate:
 
 
 
 
connection to the grid
 
approx. 14 000 cbm/hr, loading rate: 2 500 cbm/hr
 
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
* Completion is expected in 2022
+
* Completion of the onshore terminal is expected in 2026, but the floating terminal will be completed in 2023
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
Line 51: Line 40:
 
# [https://a-barrel-full.blogspot.com/2020/08/german-lng-terminal-launches-open-season.html German LNG Terminal launches Open Season]
 
# [https://a-barrel-full.blogspot.com/2020/08/german-lng-terminal-launches-open-season.html German LNG Terminal launches Open Season]
 
# [https://a-barrel-full.blogspot.com/2020/08/german-lng-terminal-shortlists-spanish.html German LNG Terminal shortlists Spanish-German Partnership to complete EPC tender process]
 
# [https://a-barrel-full.blogspot.com/2020/08/german-lng-terminal-shortlists-spanish.html German LNG Terminal shortlists Spanish-German Partnership to complete EPC tender process]
 +
 +
[[category:LNG]]
 +
[[category:Germany]]

Latest revision as of 10:41, 10 August 2022

Summary Information

  • Ownership: The partners in German LNG Terminal are N.V. Nederlandse Gasunie (Gasunie), Oiltanking GmbH and Vopak LNG Holding B.V.
  • Website: https://germanlng.com
  • Location: Brunsbüttel, Hamburg, Germany
  • Capacity: million tons/annum
  • Status:

Brief Description

  • Initially the faility will be a floating terminal, while the permanent structures are being built
  • A regasification facility with 2 tanks and annual throughput of 8 BCM
  • Distribution facilities (truck, rail car, LNG bunker barges)

Technical Details

  • Storage capacity: two tanks with 240 000 cbm
  • Unloading capacity: approx. 14 000 cbm/hr, loading rate: 2 500 cbm/hr
  • two Jetties: „Qmax“ + LNG bunker barges
  • Send out capacity: up to 8 bcm/a
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Completion of the onshore terminal is expected in 2026, but the floating terminal will be completed in 2023

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2017 - The three partners received EU antitrust approval to establish a joint venture
  • 2018 - Open season launched
  • 2020 - EPC contractor selected

Other Information

-

Links

  1. German LNG Terminal launches Open Season
  2. German LNG Terminal shortlists Spanish-German Partnership to complete EPC tender process