Gulf LNG Export Terminal Project
Jump to navigation
Jump to search
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status: (In Operation / Planned / Under Construction)
Brief Description
- The project is the conversion of Gulf Pascagoula LNG Terminal into a liquefaction plant
- Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).
- The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters
- Phase II of the project will consist of a second liquefaction train identical in size to the first train, providing a total project base level liquefaction capacity of 10 MTPA
Technical Details
- Storage capacity: 2x 160,000 M3
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in [[[LNG Terminals to be Completed in 201X | 201X]]]
Suppliers / Customers
History
Other Information
Relevant Links
- -