Difference between revisions of "Gulf LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: (In Operation / Planned / Under Construction) === Brief Descrip...") |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
=== Brief Description === | === Brief Description === | ||
− | * | + | * The project is the conversion of [[Gulf Pascagoula LNG Terminal]] into a liquefaction plant |
+ | * Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA). | ||
+ | * The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters | ||
=== Technical Details === | === Technical Details === |
Revision as of 13:38, 19 January 2022
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status: (In Operation / Planned / Under Construction)
Brief Description
- The project is the conversion of Gulf Pascagoula LNG Terminal into a liquefaction plant
- Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).
- The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters
Technical Details
- Storage capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in [[[LNG Terminals to be Completed in 201X | 201X]]]
Suppliers / Customers
- Suppliers:
- Customers:
History
- -
Other Information
- -
Relevant Links
- -