Difference between revisions of "Gulf LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: Kinder Morgan |
− | * Website: | + | * Website: https://www.kindermorgan.com/ |
− | * Location: | + | * Location: Jackson County, Miss |
− | * Capacity: million tons/annum | + | * Capacity: 10.0 million tons/annum |
− | * Status: | + | * Status: Planned |
=== Brief Description === | === Brief Description === | ||
Line 11: | Line 11: | ||
* Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA). | * Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA). | ||
* The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters | * The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters | ||
+ | * Phase II of the project will consist of a second liquefaction train identical in size to the first train, providing a total project base level liquefaction capacity of 10 MTPA | ||
=== Technical Details === | === Technical Details === | ||
* Storage capacity: 2x 160,000 M3 | * Storage capacity: 2x 160,000 M3 | ||
* Constructor: | * Constructor: | ||
− | * Licensor: | + | ** '''KBR:''' Federal Energy Regulatory Commission (FERC) FEED engineering and FERC report pre-filing services |
+ | * Licensor: Air Products | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
Line 25: | Line 27: | ||
=== History === | === History === | ||
− | * - | + | * 2014 - Kinder Morgan became the owner after merging with El Paso |
=== Other Information === | === Other Information === | ||
Line 31: | Line 33: | ||
=== Relevant Links === | === Relevant Links === | ||
− | # | + | # [https://abarrelfull.blogspot.com/2022/01/kinder-morgan-announces-closing-of.html Kinder Morgan Announces Closing of the Merger Transactions] |
+ | # [https://abarrelfull.blogspot.com/2022/01/kbr-wins-ferc-feed-contract-for-gulf.html KBR Wins FERC FEED Contract for Gulf LNG Liquefaction Company, LLC] |
Latest revision as of 14:09, 19 January 2022
Contents
Summary Information
- Ownership: Kinder Morgan
- Website: https://www.kindermorgan.com/
- Location: Jackson County, Miss
- Capacity: 10.0 million tons/annum
- Status: Planned
Brief Description
- The project is the conversion of Gulf Pascagoula LNG Terminal into a liquefaction plant
- Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).
- The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters
- Phase II of the project will consist of a second liquefaction train identical in size to the first train, providing a total project base level liquefaction capacity of 10 MTPA
Technical Details
- Storage capacity: 2x 160,000 M3
- Constructor:
- KBR: Federal Energy Regulatory Commission (FERC) FEED engineering and FERC report pre-filing services
- Licensor: Air Products
Ongoing Projects/Project Status
- Commissioning is expected in [[[LNG Terminals to be Completed in 201X | 201X]]]
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2014 - Kinder Morgan became the owner after merging with El Paso
Other Information
- -