* Ownership:  
+
* Ownership: Kinder Morgan
* Website:  
+
* Website: https://www.kindermorgan.com/
* Location:
+
* Location: Jackson County, Miss
* Capacity: million tons/annum  
+
* Capacity: 10.0 million tons/annum  
* Status: (In Operation / Planned / Under Construction)
+
* Status: Planned
  
 
=== Brief Description ===
 
=== Brief Description ===
Line 11: Line 11:
 
* Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).   
 
* Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).   
 
* The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters
 
* The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters
 +
* Phase II of the project will consist of a second liquefaction train identical in size to the first train, providing a total project base level liquefaction capacity of 10 MTPA
  
 
=== Technical Details ===
 
=== Technical Details ===
 
* Storage capacity: 2x 160,000 M3
 
* Storage capacity: 2x 160,000 M3
 
* Constructor:
 
* Constructor:
* Licensor:
+
** '''KBR:''' Federal Energy Regulatory Commission (FERC) FEED engineering and FERC report pre-filing services
 +
* Licensor: Air Products
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
Line 25: Line 27:
  
 
=== History ===
 
=== History ===
* -
+
* 2014 - Kinder Morgan became the owner after merging with El Paso
  
 
=== Other Information ===
 
=== Other Information ===
Line 31: Line 33:
  
 
=== Relevant Links ===
 
=== Relevant Links ===
# -
+
# [https://abarrelfull.blogspot.com/2022/01/kinder-morgan-announces-closing-of.html Kinder Morgan Announces Closing of the Merger Transactions]
 +
# [https://abarrelfull.blogspot.com/2022/01/kbr-wins-ferc-feed-contract-for-gulf.html KBR Wins FERC FEED Contract for Gulf LNG Liquefaction Company, LLC]

Latest revision as of 14:09, 19 January 2022

Summary Information

Brief Description

  • The project is the conversion of Gulf Pascagoula LNG Terminal into a liquefaction plant
  • Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).
  • The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters
  • Phase II of the project will consist of a second liquefaction train identical in size to the first train, providing a total project base level liquefaction capacity of 10 MTPA

Technical Details

  • Storage capacity: 2x 160,000 M3
  • Constructor:
    • KBR: Federal Energy Regulatory Commission (FERC) FEED engineering and FERC report pre-filing services
  • Licensor: Air Products

Ongoing Projects/Project Status

  • Commissioning is expected in [[[LNG Terminals to be Completed in 201X | 201X]]]

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2014 - Kinder Morgan became the owner after merging with El Paso

Other Information

  • -

Relevant Links

  1. Kinder Morgan Announces Closing of the Merger Transactions
  2. KBR Wins FERC FEED Contract for Gulf LNG Liquefaction Company, LLC