Difference between revisions of "Gulf LNG Export Terminal Project"

From A Barrel Full
Jump to navigation Jump to search
Line 32: Line 32:
  
 
=== Relevant Links ===
 
=== Relevant Links ===
#  -
+
[https://abarrelfull.blogspot.com/2022/01/kinder-morgan-announces-closing-of.html Kinder Morgan Announces Closing of the Merger Transactions]

Revision as of 13:57, 19 January 2022

Summary Information

  • Ownership:
  • Website:
  • Location:
  • Capacity: million tons/annum
  • Status: (In Operation / Planned / Under Construction)

Brief Description

  • The project is the conversion of Gulf Pascagoula LNG Terminal into a liquefaction plant
  • Phase I will consist of a single liquefaction train expected to have a base LNG production capacity of approximately 5 million tonnes per annum (MTPA).
  • The LNG produced by this train will be stored in the terminal’s two existing LNG storage tanks which have a combined capacity of 320,000 cubic meters
  • Phase II of the project will consist of a second liquefaction train identical in size to the first train, providing a total project base level liquefaction capacity of 10 MTPA

Technical Details

  • Storage capacity: 2x 160,000 M3
  • Constructor:
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning is expected in [[[LNG Terminals to be Completed in 201X | 201X]]]

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • -

Other Information

  • -

Relevant Links

  1. Kinder Morgan Announces Closing of the Merger Transactions