Difference between revisions of "Guanabara Bay LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Transpetro (Petrobras) * Website: http://www.transpetro.com.br/ * Location: Close to Boqueirão Island, in Rio de Janeiro, Brazil *...") |
Abarrelfull (talk | contribs) (→Links) |
||
Line 51: | Line 51: | ||
# [http://killajoules.wikidot.com/archive:keppel-shipyard-secures-two-conversion-projects-wort Keppel Shipyard secures two conversion projects worth S$150 million] | # [http://killajoules.wikidot.com/archive:keppel-shipyard-secures-two-conversion-projects-wort Keppel Shipyard secures two conversion projects worth S$150 million] | ||
# [http://killajoules.wikidot.com/blog:5065 Naming Ceremony for the World’s Largest FSRU, the “Experience”] | # [http://killajoules.wikidot.com/blog:5065 Naming Ceremony for the World’s Largest FSRU, the “Experience”] | ||
− | # [ ] | + | # [https://abarrelfull.blogspot.com/2021/03/excelerate-reaches-106-bcf-send-out-of.html Excelerate reaches 1.06 BCF send-out of natural gas] |
Revision as of 09:59, 17 March 2021
Contents
Summary Information
- Ownership: Transpetro (Petrobras)
- Website: http://www.transpetro.com.br/
- Location: Close to Boqueirão Island, in Rio de Janeiro, Brazil
- Capacity: 5.1BCM/annum
- Status: In Operation
Brief Description
- A floating LNG terminal, originally based on the vessel Golar Winter
- This was replaced in 2014 by "Experience" with a storage capacity of 173,400 cubic meters and sendout capability of 1 billion cubic feet per day
Technical Details
- Storage capacity: 138,000 m3
- Unloading capacity:
- Send out capacity: Guanabara Bay terminal has capacity to regas 14 million m³/day of natural gas
- Constructor:
* Moss Maritime regasification system was chosen for the Golar Spirit FSRU. * Keppel Offshore & Marine was chosen for the modification and conversion of the Golar Spirit
Ongoing Projects/Project Status
- In 2014, the vessel was replaced
Suppliers / Customers
- Suppliers:
* Various including Trinidad & Tobago, Nigeria and Algeria. Shell has an agreement to supply some of the LNG. * Petrobras has an agreement with BG Group to supply both the Guanabara Bay Lng Terminal and the [[[Pecem LNG Terminal]]]
- Customers: Natural gas regassed in Guanabara Bay will be sent to thermoelectric power stations by a 15-kilometer long gas pipeline
History
- 2007 - Petrobras signed an umbrella agreement with Sonatrach for the supply of Algerian LNG to Brazil.
- December 2007 - Construction work was started
- January 2009 - Guanabara Bay terminal construction and erection were completed
- April 2009 - Golar Winter was delivered
- 2014 - FSRU Experience completed
- 2021 - The capacity was increased to meet the theoretical limit
Other Information
- -
Links
- Floating Storage & Regasification Unit (FSRU), Golar LNG
- President Lula visits Guanabara Bay LNG Regasification Terminal
- Petrobras and Shell sign agreement for LNG supply
- BG Group and Petrobras Sign Liquefied Natural Gas Supply Agreements
- Moss Maritime, FSRUs and Regasification Systems
- Keppel Shipyard secures two conversion projects worth S$150 million
- Naming Ceremony for the World’s Largest FSRU, the “Experience”
- Excelerate reaches 1.06 BCF send-out of natural gas