Golden Pass LNG Export Terminal Project

From A Barrel Full
Revision as of 09:10, 1 February 2020 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === Ownership: Golden Pass LNG Qatar Petroleum International, (70%), ExxonMobil (30%) Website: http://www.goldenpasslng.com Location: Port Arthur, Texa...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

Ownership: Golden Pass LNG Qatar Petroleum International, (70%), ExxonMobil (30%) Website: http://www.goldenpasslng.com Location: Port Arthur, Texas, USA Capacity: million tons/annum Status: Planned

Brief Description

The proposed project would have the capacity to send out approximately 15.6 million tons of LNG per year. It involves construction of additional facilities to the existing Golden Pass Lng Terminal New infrastructure required to export will be located on the existing property, which currently contains two berths for LNG tankers, five storage tanks and access to the Golden Pass pipeline. The expanded facility would then have the capability and flexibility to both import and export natural gas.

Technical Details

Storage capacity: Constructor: CB&I / Chiyoda: Front end engineering design (FEED) services contract Licensor:

Ongoing Projects/Project Status

Commissioning is expected in 201X

Suppliers / Customers

Suppliers: Customers:

History

2012 - Golden Pass applies to the DOE to be able to export natural gas to nations that have existing free trade agreements (FTA) with the United States 2014 - CB&I / Chiyoda awarded FEED

Other Information

-

Links

Golden Pass Files Application with Department of Energy to Export LNG CB&I Announces Contract for LNG Export Facility [ Ocean LNG to offtake and market Golden Pass LNG volumes]