Difference between revisions of "Garagol Deniz West Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Petronas * Country: Turkmenistan * Location: * Production start: 2021 * Partners: * Type: Gas * Estimated Reserves: * Production Vol...") |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
* Operator: Petronas | * Operator: Petronas | ||
* Country: Turkmenistan | * Country: Turkmenistan | ||
− | * Location: | + | * Location: Caspian Sea |
* Production start: 2021 | * Production start: 2021 | ||
* Partners: | * Partners: | ||
− | * Type: Gas | + | * Type: Oil & Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
=== Description === | === Description === | ||
− | * | + | * The Garagol Deniz West field is located around 75km offshore of Turkmenistan in the Caspian Sea. |
+ | * The development consists of a normally unmanned platform connected by a subsea pipeline to an onshore gas processing plant. | ||
+ | * The platform has capacity of 10.000 bpd oil and 35 mmscfd gas and is located in 35 m water depth. | ||
=== Contractors === | === Contractors === | ||
− | * | + | * '''Ilk Insaat:''' EPCC of Offshore Platform |
+ | * '''Serimax:''' Pipeline from the platform to the processing facility | ||
=== History === | === History === | ||
− | * | + | * 2021 - First gas produced |
=== Geology === | === Geology === | ||
Line 22: | Line 25: | ||
=== Links === | === Links === | ||
− | # | + | # [[Ilk Insaat Platform References]] |
+ | # [[Serimax Pipeline References]] | ||
Latest revision as of 10:20, 22 February 2024
Summary Information
- Operator: Petronas
- Country: Turkmenistan
- Location: Caspian Sea
- Production start: 2021
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Garagol Deniz West field is located around 75km offshore of Turkmenistan in the Caspian Sea.
- The development consists of a normally unmanned platform connected by a subsea pipeline to an onshore gas processing plant.
- The platform has capacity of 10.000 bpd oil and 35 mmscfd gas and is located in 35 m water depth.
Contractors
- Ilk Insaat: EPCC of Offshore Platform
- Serimax: Pipeline from the platform to the processing facility
History
- 2021 - First gas produced