Difference between revisions of "Gabriel Passos REGAP Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(One intermediate revision by the same user not shown) | |||
Line 38: | Line 38: | ||
* 2009 - The diesel hydrotreatment unit went on stream | * 2009 - The diesel hydrotreatment unit went on stream | ||
* 2012 - Co-generation unit commissioned | * 2012 - Co-generation unit commissioned | ||
+ | * 2019 - Privatisation process launched | ||
+ | |||
=== Links === | === Links === | ||
# [https://petrobras.com.br/en/our-activities/main-operations/refineries/gabriel-passos-regap.htm Refinery webpage] | # [https://petrobras.com.br/en/our-activities/main-operations/refineries/gabriel-passos-regap.htm Refinery webpage] | ||
Line 43: | Line 45: | ||
# [[Saipem Atmospheric Crude Distillation Units]] | # [[Saipem Atmospheric Crude Distillation Units]] | ||
# [[Saipem Naphtha Treating Units]] | # [[Saipem Naphtha Treating Units]] | ||
+ | # [http://killajoules.wikidot.com/archive:petrobras-starts-binding-phase-of-regap Petrobras starts binding phase of Regap] | ||
[[Category:Refinery]] | [[Category:Refinery]] | ||
[[Category:Brazil]] | [[Category:Brazil]] | ||
[[Category:Petrobras]] | [[Category:Petrobras]] |
Latest revision as of 09:58, 1 April 2020
Contents
Summary Information
- Ownership: Petrobras
- Website: http://www.petrobras.com.br/en/
- List of Petrobras Refineries
- Location: Belo Horizonte, Brazil
- Capacity: 7.5 million tons/annum & 150,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
- A medium sized, high complexity refinery
Refining Units
- Atmospheric Distillation
- Vacuum unit
- Catalytic cracking Unit
- Delayed Coking Unit
- Hydrogen generation unit
- Desulphurisation
- Kerosene
- Diesel
- Naphtha
- Co-generation unit
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
- Gasoline, diesel fuel, bunker, jet fuel, liquefied petroleum gas (LPG), asphalt, green petroleum coke, fuel oil, sulfur, and turpentine
Projects
-
Other Information
-
History
- 1968 - Refinery commissioned by Snamprogetti with capacity of 45,000 bpd
- 2009 - The diesel hydrotreatment unit went on stream
- 2012 - Co-generation unit commissioned
- 2019 - Privatisation process launched