Difference between revisions of "Fos sur Mer Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 26: | Line 26: | ||
=== History === | === History === | ||
* 1965 - Refinery is commissioned | * 1965 - Refinery is commissioned | ||
+ | * 2004 - Start up of SCANfiner, for Desulfurization of cracked gasoline | ||
+ | * 2007 - Commissioning of a new vacuum distillation tower | ||
+ | * 2008 - Euro V diesel project completed | ||
+ | |||
=== Links === | === Links === | ||
# [http://essobenelux.com/Corporate/Newsroom/Publications/shareholder_publications/c_fo_00/pdf/downstream_fin.pdf Exxon Refineries Throughput, Capacity and Utilisation] | # [http://essobenelux.com/Corporate/Newsroom/Publications/shareholder_publications/c_fo_00/pdf/downstream_fin.pdf Exxon Refineries Throughput, Capacity and Utilisation] |
Revision as of 16:50, 17 February 2020
Contents
Summary Information
- Ownership: Exxon Mobil
- Website: http://www.exxonmobil.com/
- List of Exxon Mobil Refineries
- Location: Fos Sur Mer, France
- Capacity: 7.1 million tons/annum & 143,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Refining Units
- Atmospheric Distillation, 143,000
- Vacuum Distillation
- Fluidised Catalytic Cracking - 17,000
- Desulphurisation
- Sulphur Recovery
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
-
Ongoing Projects
-
Other Information
-
History
- 1965 - Refinery is commissioned
- 2004 - Start up of SCANfiner, for Desulfurization of cracked gasoline
- 2007 - Commissioning of a new vacuum distillation tower
- 2008 - Euro V diesel project completed