F23 Gas and Condensate Field
Revision as of 12:25, 25 October 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Shell * Country: Malaysia * Location: Luconia * Production start: 1985 * Partners: * Type: Gas And Condensate * Estimated Reserves: * Produc...")
Summary Information
- Operator: Shell
- Country: Malaysia
- Location: Luconia
- Production start: 1985
- Partners:
- Type: Gas And Condensate
- Estimated Reserves:
- Production Volume:
+++ Description
- The Cili Padi Gas Field is tied back to the F23R-A Platform
- The F23 field itself, is now tied back to the E11 Complex Gas Fields
+++ Contractors
- **HHI:** Jacket, Pile and Platform Modules construction
- **Technics Offshore:** Gas compressor package
- **Sime Darby:** Vlap Compression Module
- **Global Asia Pacific:** Pipeline installation
- **Ramunia Fabricator:** F23-RA Gas Cili Padi Gas Field Development
+++ History
- 1985 - Production started
+++ Geology
- The accumulation consists of a Late Miocene layered platform type carbonate build-up with an areal extent of 22 km2 and a maximum gas thickness of over 1000 ft
+++ Links