Difference between revisions of "Exxon Singapore Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: Exxon Website: http://www.exxonmobil.com List of Exxon Mobil Refineries Location: Jurong Island, Singapore Capacity: 30 million tons/annum & 605...")
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: Exxon
+
 
Website: http://www.exxonmobil.com
+
* Ownership: Exxon
List of Exxon Mobil Refineries
+
* Website: http://www.exxonmobil.com
Location: Jurong Island, Singapore
+
** List of [[Exxon Mobil Refineries]]
Capacity: 30 million tons/annum & 605,000 bbl/day
+
* Location: Jurong Island, Singapore
Nelson Complexity:
+
* Capacity: 30 million tons/annum & 605,000 bbl/day
Refining Depth:
+
* Nelson Complexity:  
Brief Description
+
* Refining Depth:
ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery.
+
 
Refining Units
+
=== Brief Description ===
Atmospheric Distillation
+
* ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery.
Vacuum Distillation Unit
+
 
Hydrocracker -23,000 bpd
+
=== Refining Units ===
Continuous catalytic reformer
+
 
Visbreaker - 55,000 bpd
+
* Atmospheric Distillation
Distillate Dewaxing Unit - 12,000
+
* Vacuum Distillation Unit
Hydrogen Unit - 27,900 (Nm3/Hr)
+
* Hydrocracker -23,000 bpd
Asphalt Unit
+
* Continuous catalytic reformer  
Terminal Capacity
+
* Visbreaker - 55,000 bpd
Crude Oil:
+
* Distillate Dewaxing Unit - 12,000
Refined Products:
+
* Hydrogen Unit - 27,900 (Nm3/Hr)
Crude Supply
+
* Asphalt Unit
Can handle a wide range of crudes
+
 
Products Produced
+
=== Terminal Capacity ===
LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil
+
 
Ongoing Projects
+
* Crude Oil:  
In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel
+
* Refined Products:  
It will come on stream by 2014
+
 
Other Information
+
=== Crude Supply ===
-
+
* Can handle a wide range of crudes  
History
+
 
1965 - Jurong Refinery comes on stream
+
=== Products Produced ===
1971 - Jurong Island (PAC) Refinery comes on stream
+
* LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil
1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda)
+
 
1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda)
+
=== Projects ===
1985 - Mobil revamps it CDU to allow the processing of far eastern crudes
+
* The [[Exxon Singapore Resid Upgrade Project]] will add approximately 20,000 barrels per day of light, heavy and extra-heavy lubricant base stocks. Exxon expects the project to be completed in [[Refinery Projects to be completed in 2025 | 2025]]
1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda)
+
* In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel
1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit
+
* It came on stream in 2014
1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd
+
 
2014 - Light Oil Desulphurization Unit commissioned
+
=== Other Information ===
Relevant Links
+
* -
Chiyoda Crude Distillation Units
+
 
Chiyoda Distillate Dewaxing Units
+
=== History ===
Chiyoda Sulfur Recovery Units
+
* 1965 - Jurong Refinery comes on stream
Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
+
* 1971 - Jurong Island (PAC) Refinery comes on stream
Chiyoda Hydrogen Manufacturing Units
+
* 1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda)
Chiyoda Sweetening Units
+
* 1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda)
Chiyoda H2S Removal Units With Amine
+
* 1985 - Mobil revamps it CDU to allow the processing of far eastern crudes
Chiyoda Vacuum Flasher Vacuum Distillation Units
+
* 1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda)
JGC Refinery References
+
* 1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit
Refinery Webpage
+
* 1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd
New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply
+
* 2014 - Light Oil Desulphurization Unit commissioned
Exxon's Singapore visbreaker shut for repairs
+
 
Industrial Incident at Singapore Refinery
+
=== Links ===
 +
 
 +
# [[Chiyoda Blown Asphalt (Bitumen) Units]]
 +
# [[Chiyoda Crude Distillation Units]]
 +
# [[Chiyoda Distillate Dewaxing Units]]
 +
# [[Chiyoda Sulfur Recovery Units]]
 +
# [[Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U]]
 +
# [[Chiyoda Hydrogen Manufacturing Units]]
 +
# [[Chiyoda Sweetening Units]]
 +
# [[Chiyoda H2S Removal Units With Amine]]
 +
# [[Chiyoda Vacuum Flasher Vacuum Distillation Units]]
 +
# [[JGC Refinery References]]
 +
# [http://www.exxonmobil.com/AP-English/about_who_profile_refinery.aspx Refinery Webpage]
 +
# [http://www.exxonmobil.com/AP-English/news_releases_20101123.aspx New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply]
 +
# [http://gulfnews.com/business/oil-gas/exxon-s-singapore-visbreaker-shut-for-repairs-1.444000 Exxon's Singapore visbreaker shut for repairs]
 +
# [http://killajoules.wikidot.com/blog:687 Industrial Incident at Singapore Refinery]
 +
# [https://abarrelfull.blogspot.com/2022/09/exxonmobil-advancing-singapore-resid.html ExxonMobil Advancing Singapore Resid Upgrade Project Towards 2025 Startup]
 +
 
 +
[[Category:Refinery]]
 +
[[Category:Singapore]]
 +
[[Category:ExxonMobil]]

Latest revision as of 14:45, 7 February 2024

Summary Information

Brief Description

  • ExxonMobil's Singapore Refinery has two operating sites - one on the mainland and another on Jurong Island. The integrated refinery manufactures a wide range of fuels, lubes and specialty products. The Refinery also provides advantaged feedstock to the steam cracker and two aromatics plants that are located adjacent to the Refinery.

Refining Units

  • Atmospheric Distillation
  • Vacuum Distillation Unit
  • Hydrocracker -23,000 bpd
  • Continuous catalytic reformer
  • Visbreaker - 55,000 bpd
  • Distillate Dewaxing Unit - 12,000
  • Hydrogen Unit - 27,900 (Nm3/Hr)
  • Asphalt Unit

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • Can handle a wide range of crudes

Products Produced

  • LPG, Naphtha, Gasoline, Diesel, Jet Fuel, Fuel Oil

Projects

  • The Exxon Singapore Resid Upgrade Project will add approximately 20,000 barrels per day of light, heavy and extra-heavy lubricant base stocks. Exxon expects the project to be completed in 2025
  • In 2010, ExxonMobil announced its plans to build a diesel hydrotreater at its Singapore refinery, increasing the refinery’s production capacity of ultra low sulfur diesel fuel
  • It came on stream in 2014

Other Information

  • -

History

  • 1965 - Jurong Refinery comes on stream
  • 1971 - Jurong Island (PAC) Refinery comes on stream
  • 1973 - Capacity expanded with the addition of 157,000 bpd CDU (Chiyoda)
  • 1982 - Atmospheric distillation unit debottlenecked, visbreaker and Vacuum Distillation Unit added (Chiyoda)
  • 1985 - Mobil revamps it CDU to allow the processing of far eastern crudes
  • 1990 - Hydrocracking unit, Hydrogen Unit and Distillate Dewaxing Unit commissioned (Chiyoda)
  • 1994 - Mobil completes its US$1.1 billion continuous catalytic reformer and aromatics unit
  • 1997 - Mobil completes US$250 million lubricant base oil plant. Refining capacity at Pioneer Road facility raised to 300,000 bpd
  • 2014 - Light Oil Desulphurization Unit commissioned

Links

  1. Chiyoda Blown Asphalt (Bitumen) Units
  2. Chiyoda Crude Distillation Units
  3. Chiyoda Distillate Dewaxing Units
  4. Chiyoda Sulfur Recovery Units
  5. Chiyoda Naphtha And Middle Distillate Hydrodesulfurization U
  6. Chiyoda Hydrogen Manufacturing Units
  7. Chiyoda Sweetening Units
  8. Chiyoda H2S Removal Units With Amine
  9. Chiyoda Vacuum Flasher Vacuum Distillation Units
  10. JGC Refinery References
  11. Refinery Webpage
  12. New Singapore diesel hydrotreater project to boost ultra low sulfur diesel supply
  13. Exxon's Singapore visbreaker shut for repairs
  14. Industrial Incident at Singapore Refinery
  15. ExxonMobil Advancing Singapore Resid Upgrade Project Towards 2025 Startup