Difference between revisions of "El Musel LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Ownership: Enagas | * Ownership: Enagas | ||
Line 7: | Line 7: | ||
* Status: Under Construction | * Status: Under Construction | ||
− | + | === Brief Description === | |
− | * A | + | * A regasification terminal with two large tanks and unloading facilities for the largest tankers |
− | + | === Technical Details === | |
* Storage capacity: two 150,000 cubic meter LNG tanks | * Storage capacity: two 150,000 cubic meter LNG tanks | ||
* Unloading capacity: A jetty will allow the unloading of LNG carriers with a capacity up to 230,000 m3 | * Unloading capacity: A jetty will allow the unloading of LNG carriers with a capacity up to 230,000 m3 | ||
* Send out capacity: 800,000 normal cubic meters/hour | * Send out capacity: 800,000 normal cubic meters/hour | ||
* Constructor: | * Constructor: | ||
− | + | ** **Fluor:** Detailed engineering, procurement services and construction management (EPCM) | |
− | + | ** **Sofregaz-SENER:** Basic engineering | |
− | + | ** **IKM Testing:** Pre-commissioning and commissioning contract | |
− | |||
− | + | ||
+ | === Ongoing Projects/Project Status === | ||
* The project has been postponed by order of the energy regulator | * The project has been postponed by order of the energy regulator | ||
− | * Commissioning is expected in | + | * Commissioning is expected in [[LNG Terminals to be Completed in 2012 | 2012]] |
− | + | === Suppliers / Customers === | |
* Suppliers: | * Suppliers: | ||
* Customers: The terminal will supply the domestic gas grid and two combined cycle power stations in the Asturia province | * Customers: The terminal will supply the domestic gas grid and two combined cycle power stations in the Asturia province | ||
− | + | === History === | |
* 2006 - The Ministry of Industry awarded the terminal contract to Enagas | * 2006 - The Ministry of Industry awarded the terminal contract to Enagas | ||
* 2008 - Fluor awarded EPC contract | * 2008 - Fluor awarded EPC contract | ||
* 2012 - IKM Testing awarded commissioning contract | * 2012 - IKM Testing awarded commissioning contract | ||
− | + | === Other Information === | |
* The terminal is being built on land reclaimed from the sea | * The terminal is being built on land reclaimed from the sea | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/archive:the-new-regasification-plant-in-el-musel-has-been-aw The new regasification plant in El Musel has been awarded to Enagas] | # [http://killajoules.wikidot.com/archive:the-new-regasification-plant-in-el-musel-has-been-aw The new regasification plant in El Musel has been awarded to Enagas] |
Revision as of 14:23, 19 February 2023
Contents
Summary Information
- Ownership: Enagas
- Website: http://www.enagas.es/
- Location: Near the city of Gijon in the province of Asturias, North Coast of Spain
- Capacity: million tons/annum
- Status: Under Construction
Brief Description
- A regasification terminal with two large tanks and unloading facilities for the largest tankers
Technical Details
- Storage capacity: two 150,000 cubic meter LNG tanks
- Unloading capacity: A jetty will allow the unloading of LNG carriers with a capacity up to 230,000 m3
- Send out capacity: 800,000 normal cubic meters/hour
- Constructor:
- **Fluor:** Detailed engineering, procurement services and construction management (EPCM)
- **Sofregaz-SENER:** Basic engineering
- **IKM Testing:** Pre-commissioning and commissioning contract
Ongoing Projects/Project Status
- The project has been postponed by order of the energy regulator
- Commissioning is expected in 2012
Suppliers / Customers
- Suppliers:
- Customers: The terminal will supply the domestic gas grid and two combined cycle power stations in the Asturia province
History
- 2006 - The Ministry of Industry awarded the terminal contract to Enagas
- 2008 - Fluor awarded EPC contract
- 2012 - IKM Testing awarded commissioning contract
Other Information
- The terminal is being built on land reclaimed from the sea