Difference between revisions of "Durward and Dauntless Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 34: | Line 34: | ||
[[category:Field]] | [[category:Field]] | ||
[[category:UK]] | [[category:UK]] | ||
− | [[category: | + | [[category:Hess]] |
Latest revision as of 07:22, 19 February 2024
Summary Information
- Operator: Amerada Hess
- Country: UK
- Location:
- Production start: 1997
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
Description
- The fields were developed using the Glas Dowr FPSO which had crude processing capacity of 60,000 bopd, 85 MMscfd of gas and storage of 660,000 barrels
- The field has been decommissioned
Contractors
- Bluewater: Provision of FPSO
- Seaway: FPSO mooring
History
- 1994 - Dauntless field discovered
- 1996 - Field development approved by regulators
- 2002 - Decommissioning plan approved