Downeast LNG Terminal
Revision as of 15:23, 9 February 2024 by Abarrelfull (talk | contribs)
Summary Information
- Ownership: Downeast LNG
- Website: http://www.downeastlng.com/
- Location: Passamaquoddy Bay, Maine, USA
- Capacity: million tons/annum
- Status: Planned
+++ Brief Description
- The proposed facility will consist of two storage tanks, a re-gasification plant and a pier to receive LNG carriers.
+++ Technical Details
- Storage capacity: two 160,000 m3 full containment type tanks
- Unloading capacity: LNG vessels with cargo capacities no greater than 165,000 m3.
- Send out capacity: the terminal would have an average total output of 500 MMcfd
- Constructor:
+++ Ongoing Projects/Project Status
- Final EIS recieved (2014)
+++ Suppliers / Customers
- Suppliers:
- Customers:
- The sendout pipeline would extend from the LNG terminal to the existing M&NE pipeline system at the Baileyville Compressor Station
- The M&NE pipeline system serves Maine, New Hampshire, and Massachusetts
+++ History
- 2005 - LNG Terminal Proposed
- 2006 - Application filed with FERC
- 2009 - Draft EIS published by FERC
- 2014 - FERC publishes final EIS
+++ Other Information
- -
+++ Relevant Links