Downeast LNG Terminal

From A Barrel Full
Revision as of 15:23, 9 February 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Downeast LNG * Website: http://www.downeastlng.com/ * Location: Passamaquoddy Bay, Maine, USA * Capacity: million tons/annum * Status: Plan...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Ownership: Downeast LNG
  • Website: http://www.downeastlng.com/
  • Location: Passamaquoddy Bay, Maine, USA
  • Capacity: million tons/annum
  • Status: Planned

+++ Brief Description

  • The proposed facility will consist of two storage tanks, a re-gasification plant and a pier to receive LNG carriers.

+++ Technical Details

  • Storage capacity: two 160,000 m3 full containment type tanks
  • Unloading capacity: LNG vessels with cargo capacities no greater than 165,000 m3.
  • Send out capacity: the terminal would have an average total output of 500 MMcfd
  • Constructor:


+++ Ongoing Projects/Project Status

  • Final EIS recieved (2014)

+++ Suppliers / Customers

  • Suppliers:
  • Customers:
* The sendout pipeline would extend from the LNG terminal to the existing M&NE pipeline system at the Baileyville Compressor Station
* The M&NE pipeline system serves Maine, New Hampshire, and Massachusetts


+++ History

  • 2005 - LNG Terminal Proposed
  • 2006 - Application filed with FERC
  • 2009 - Draft EIS published by FERC
  • 2014 - FERC publishes final EIS

+++ Other Information

  • -

+++ Relevant Links

  1. Draft EIS for the Downeast LNG Project
  2. DESCRIPTION OF THE PROPOSED ACTION
  3. CH·IV INTERNATIONAL CONTRIBUTES TO DOWNEAST LNG’S FEDERAL PERMIT APPLICATIONS
  4. FERC issues Final Environmental Impact Statement on the Downeast LNG Project