Didon Offshore Oil Field
Revision as of 18:58, 2 March 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Enquest * Country: Tunisia * Location: Zarat Permit, Offshore * Production start: 1998 * Partners: * Type: Oil * Estimated Reserves: * Pro...")
Summary Information
- Operator: Enquest
- Country: Tunisia
- Location: Zarat Permit, Offshore
- Production start: 1998
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
+++ Description
- The development consists of a WH Platform connected to the vessel Didon FSO
+++ Contractors
- **Micoperi:** Phase II
* Offshore installation of the production jacket, topside drilling and production platform, inst. & hook up * Installation of 5”coiled tubing and umbilicals
+++ History
- 1998 - First oil produced
- 2005 - PA Resources became the major shareholder
- 2006 - New platform starts production
- 2007 - Phase II of the Didon development completed
- 2008 - Oil Discovery At Didon North
- 2013 - Enquest acquired a 70% interest in the field
+++ Geology
+++ Links
- Micoperi Offshore Pipeline References
- FoundOcean Subsea References
- Oil And Gas Concessions In Tunisia
- Supplementary Information To The PA Resources Acquisition Of Tunisian Assets
- Closing Of Didon/Zarat
- First Oil From The Platform On The Didon-Field
- PA Resources’ Vessel Didon FSO Is Back In Operation At The Didon Field
- PA Resources Makes Oil Discovery At Didon North
- Enquest Announces Its Entry Into North Africa Through A 70% Operating Interest In The Producing Didon Oil Field And The Zarat Permit In Tunisia