Difference between revisions of "Cilacap Refinery Upgrade Project"

From A Barrel Full
Jump to navigation Jump to search
 
(9 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
* Wiki Page: [[Cilacap Refinery]]
 
* Wiki Page: [[Cilacap Refinery]]
 
* Location: Central Java, Indonesia
 
* Location: Central Java, Indonesia
* Capacity: 17.4 Million tons/annum & 348,000 bbl/day
+
** Old Capacity: 17.4 Million tons/annum & 348,000 bbl/day
 +
** New Capacity: 18.5 Million tons/annum & 370,000 bbl/day
 
* Nelson Complexity:
 
* Nelson Complexity:
 
* Project Stage: Planning
 
* Project Stage: Planning
* Expected Completion: 2014
+
* Expected Completion: 2022
* Budget: $1.5 billion
+
* Budget: $4-5 billion
 +
 
 
=== The Project ===
 
=== The Project ===
* Project Type: Upgrading to improve product yields
+
* Project Type: Expansion and upgrade of the refinery and increase capacity of petrochemicals
* Project Summary: The project will involve construction of a residue fluid catalytic-cracking (RFCC)
+
* Project Summary: The upgrade and expansion project is intended to increase the capacity of the refinery to 370,000 barrels per day, maximise production of cleaner gasoline and diesel, produce higher quality base oils for the domestic market, and expand aromatics and polypropylene production to more than 600,000 tonnes and 160,000 tonnes per year, respectively.
 
* Main Contractors:
 
* Main Contractors:
** GS Engineering - EPC
+
** Amec Foster Wheeler: Engineering and Project Management Services Contract
** Foster Wheeler - Project Management Consultancy Contract
+
 
** Licences: UOP & Axens
 
 
=== Refining Units ===
 
=== Refining Units ===
* Residue fluid catalytic-cracking (RFCC) - 60,000 bpd
+
*
 +
 
 
=== Terminal Capacity ===
 
=== Terminal Capacity ===
 
* Crude Oil:
 
* Crude Oil:
Line 25: Line 27:
 
-
 
-
 
=== Products Produced ===
 
=== Products Produced ===
* The project will increase production of LPG, Propylene and Gasoline
+
* The project will increase production of gasoline, diesel, aromatics and polypropylene.
 +
 
 
=== History ===
 
=== History ===
* 2008 - Pertamina & Mitsui create joint venture for the project
+
* 2015 - Heads of Agreement (HOA) which was signed by Pertamina and Saudi Aramco
* 2010 - Pertamina, Mitsui jointly liquidated PT Pertamit Processing, the joint venture company established to run the project
+
* 2016 - Amec Foster Wheeler Awarded Engineering and Project Management Services Contract
* 2011 - Sinopec Engineering awarded EPC contract
+
 
* 2011 - Construction of the project launched
 
* 2012 - Foster Wheeler Awarded Project Management Consultancy Contract
 
 
=== Other Information ===
 
=== Other Information ===
* The project is in accordance with Pertamina plans to fuel self-sufficiency by 2018
+
* The project has been changed and delayed a number of times
 +
* A number of partners have also come and gone
 +
 
 
=== Links ===
 
=== Links ===
# [http://www.pertamina.com/index.php/detail/view/news-release/2744/kerja-sama-pertamina-mitsui-untuk-proyek-rfcc-berakhir Pertamina Cooperation with Mitsui for RFCC Project Ended] (Indonesian)
+
# [https://abarrelfull.blogspot.com/2021/03/amec-foster-wheeler-wins-indonesian.html Amec Foster Wheeler wins Indonesian refinery upgrade contract]
# [http://www.reuters.com/article/2009/04/20/mitsui-indonesia-idUSJAK43865220090420 Pertamina, Mitsui refinery project may stall]
+
# [https://abarrelfull.blogspot.com/2021/03/contract-for-cilacap-refinery-upgrade.html Contract for Cilacap refinery upgrade awarded to Amec Foster Wheeler]
# [http://www.pertamina.com/index.php?option=com_content&task=view&id=5434&Itemid=856 TENDER ANNOUNCEMENT FOR ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) OF THE RESID FLUID CATALYTIC CRACKING PROJECT]
 
# [http://killajoules.wikidot.com/blog:1847 President Inaugurates Pertamina RFCC Project Commencement]
 
# [http://killajoules.wikidot.com/blog:2274 Foster Wheeler Awarded Project Management Consultancy Contract for Cilacap Refinery Upgrade in Indonesia]
 
  
 
[[Category:Refinery]]
 
[[Category:Refinery]]
 
[[Category:Indonesia]]
 
[[Category:Indonesia]]
 
[[Category:Pertamina]]
 
[[Category:Pertamina]]

Latest revision as of 16:46, 23 March 2021

Summary Information

  • Ownership: Pertamina
  • Website: http://www.pertamina.com/
  • List of Pertamina Refineries
  • Wiki Page: Cilacap Refinery
  • Location: Central Java, Indonesia
    • Old Capacity: 17.4 Million tons/annum & 348,000 bbl/day
    • New Capacity: 18.5 Million tons/annum & 370,000 bbl/day
  • Nelson Complexity:
  • Project Stage: Planning
  • Expected Completion: 2022
  • Budget: $4-5 billion

The Project

  • Project Type: Expansion and upgrade of the refinery and increase capacity of petrochemicals
  • Project Summary: The upgrade and expansion project is intended to increase the capacity of the refinery to 370,000 barrels per day, maximise production of cleaner gasoline and diesel, produce higher quality base oils for the domestic market, and expand aromatics and polypropylene production to more than 600,000 tonnes and 160,000 tonnes per year, respectively.
  • Main Contractors:
    • Amec Foster Wheeler: Engineering and Project Management Services Contract

Refining Units

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • The project will increase production of gasoline, diesel, aromatics and polypropylene.

History

  • 2015 - Heads of Agreement (HOA) which was signed by Pertamina and Saudi Aramco
  • 2016 - Amec Foster Wheeler Awarded Engineering and Project Management Services Contract

Other Information

  • The project has been changed and delayed a number of times
  • A number of partners have also come and gone

Links

  1. Amec Foster Wheeler wins Indonesian refinery upgrade contract
  2. Contract for Cilacap refinery upgrade awarded to Amec Foster Wheeler