Chiba Refinery

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership: Cosmo Oil
  • Website: http://www.cosmo-oil.co.jp/
  • Location: Chiba, Japan
  • Capacity: 11.2 million tons/annum & 240,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Refining Units

  • Atmospheric Distillation 110,000 bpd + 130,000 bpd
  • Vacuum Distillation Unit 20,000 bpd + 60,000 bpd
  • Prefractionator Unit 23,000 bpd
  • Catalytic Reforming Unit 11,500 bpd + 25,000 bpd
  • Reformate Splitter 9,000 bpd + 20,000 bpd
  • Fluid Catalytic Cracking Unit 40,000 bpd
  • FCC Gasoline Hydrodesulfurization Unit 24,000 bpd
  • Hydrodesulfurization Units 8,000 bpd + 26,000 bpd + 55,000 bpd + 50,000 bpd
  • Isomerization Unit 6,000 bpd
  • Vacuum Gas Oil Hydrodesulfurization Unit 35,000 bpd
  • Hydrogen Recovery by Membranes Separation System Unit 331,200 m³N / day
  • Fuel Oil Hydrodesulfurization Unit 36,000 bpd + 36,000 bpd
  • No.1 Hydrogen Producing Unit 648,000 m³N / day
  • No.10·20 Hydrogen Producing Unit 880,000 m³N / day × 2
  • Sulfur Recovery Unit(With Tail Gas Treating Unit) 150 t / day × 3
  • Blown Asphalt Unit 3,600 t / month

Terminal Capacity

  • Crude Oil: (13units) 930,000kl
  • Finished Product /Semi-processed Product Tanks (119units) 1,490,000kl
  • Lubricating Oil Tanks (66units) 24,000kl
  • Sulfur Tanks (2units) 13,200kl
  • Asphalt Tanks (20units) 28,000kl
  • LPG Tanks (23units) 52,700kl

Crude Supply

  • Crude is primarily supplied from the Middle East, including UAE, S Arabia, Qatar, Iran & Kuwait

Products Produced

  • LPG, Gasoline, Diesel, Jet Fuel, Fuel Oil, Asphalt, Sulphur

Projects

-

Other Information

-

History

  • 1963 - Refinery commissioned
  • 1967 - Asphalt Unit commissioned
  • 1969 - Gas Oil Hydrodesulfurization & Hydrogen Units added
  • 1977 - Residuum Hydrodesulfurization & Hydrogen Units commissioned
  • 2006 - Fire and explosion in the desulfurization unit
  • 2010 - Nameplate capacity reduced by 20,000 to 220,000 bbl/day
  • 2011 - Refinery fire occurs after an earthquake
  • 2012 - Restart of CDU damaged in the fire

Links

  1. Refinery Webpage
  2. Japanese Refining Capacities
  3. [[[Chiyoda Crude Distillation Units]]]
  4. [[[Chiyoda Blown Asphalt Bitumen Units]]]
  5. [[[Chiyoda Residuum Hydrodesulfurization Units]]]
  6. [[[Chiyoda Vacuum Gas Oil Hydrodesulfurization Units]]]
  7. [[[Chiyoda Hydrogen Manufacturing Units]]]
  8. [[[Chiyoda Sulfur Recovery Units]]]
  9. [[[Chiyoda H2S Removal Units With Amine]]]
  10. [[[Chiyoda Sour Water Stripping Units]]]
  11. Reduction of CDU Nameplate Capacity
  12. Preparations for Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
  13. Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
  14. Preparations to Resume Operation of the #1 CDU at Chiba Refinery Following Completion of the Safety Inspection
  15. Cosmo Oil, Implementation of Restructuring of Refinery Supply