Difference between revisions of "Chiba Refinery"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information Ownership: Cosmo Oil Website: http://www.cosmo-oil.co.jp/ Location: Chiba, Japan Capacity: 11.2 million tons/annum & 240,000 bbl/day Nelson Complexity: Ref...")
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
Ownership: Cosmo Oil
+
* Ownership: Cosmo Oil
Website: http://www.cosmo-oil.co.jp/
+
* Website: http://www.cosmo-oil.co.jp/
Location: Chiba, Japan
+
* Location: Chiba, Japan
Capacity: 11.2 million tons/annum & 240,000 bbl/day
+
* Capacity: 7.9 million tons/annum & 177,000 bbl/day
Nelson Complexity:
+
* Nelson Complexity:
Refining Depth:
+
* Refining Depth:
Refining Units
+
=== Refining Units ===
Atmospheric Distillation 110,000 bpd + 130,000 bpd
+
* Atmospheric Distillation 75,000 bpd + 102,000 bpd
Vacuum Distillation Unit 20,000 bpd + 60,000 bpd
+
* Vacuum Distillation Unit 20,000 bpd + 60,000 bpd
Prefractionator Unit 23,000 bpd
+
* Prefractionator Unit 23,000 bpd
Catalytic Reforming Unit 11,500 bpd + 25,000 bpd
+
* Catalytic Reforming Unit 11,500 bpd + 25,000 bpd
Reformate Splitter 9,000 bpd + 20,000 bpd
+
* Reformate Splitter 9,000 bpd + 20,000 bpd
Fluid Catalytic Cracking Unit 40,000 bpd
+
* Fluid Catalytic Cracking Unit 40,000 bpd
FCC Gasoline Hydrodesulfurization Unit 24,000 bpd
+
* FCC Gasoline Hydrodesulfurization Unit 24,000 bpd
Hydrodesulfurization Units 8,000 bpd + 26,000 bpd + 55,000 bpd + 50,000 bpd
+
* Hydrodesulfurization Units 8,000 bpd + 26,000 bpd + 55,000 bpd + 50,000 bpd
Isomerization Unit 6,000 bpd
+
* Isomerization Unit 6,000 bpd
Vacuum Gas Oil Hydrodesulfurization Unit 35,000 bpd
+
* Vacuum Gas Oil Hydrodesulfurization Unit 35,000 bpd
Hydrogen Recovery by Membranes Separation System Unit 331,200 m³N / day
+
* Hydrogen Recovery by Membranes Separation System Unit 331,200 m³N / day
Fuel Oil Hydrodesulfurization Unit 36,000 bpd + 36,000 bpd
+
* Fuel Oil Hydrodesulfurization Unit 36,000 bpd + 36,000 bpd
No.1 Hydrogen Producing Unit 648,000 m³N / day
+
* No.1 Hydrogen Producing Unit 648,000 m³N / day
No.10·20 Hydrogen Producing Unit 880,000 m³N / day × 2
+
* No.10·20 Hydrogen Producing Unit 880,000 m³N / day × 2
Sulfur Recovery Unit(With Tail Gas Treating Unit) 150 t / day × 3
+
* Sulfur Recovery Unit(With Tail Gas Treating Unit) 150 t / day × 3
Blown Asphalt Unit 3,600 t / month
+
* Blown Asphalt Unit 3,600 t / month
Terminal Capacity
+
=== Terminal Capacity ===
Crude Oil: (13units) 930,000kl
+
* Crude Oil: (13units) 930,000kl
Finished Product /Semi-processed Product Tanks (119units) 1,490,000kl
+
* Finished Product /Semi-processed Product Tanks (119units) 1,490,000kl
Lubricating Oil Tanks (66units) 24,000kl
+
* Lubricating Oil Tanks (66units) 24,000kl
Sulfur Tanks (2units) 13,200kl
+
* Sulfur Tanks (2units) 13,200kl
Asphalt Tanks (20units) 28,000kl
+
* Asphalt Tanks (20units) 28,000kl
LPG Tanks (23units) 52,700kl
+
* LPG Tanks (23units) 52,700kl
Crude Supply
+
 
Crude is primarily supplied from the Middle East, including UAE, S Arabia, Qatar, Iran & Kuwait
+
=== Crude Supply ===
Products Produced
+
* Crude is primarily supplied from the Middle East, including UAE, S Arabia, Qatar, Iran & Kuwait
LPG, Gasoline, Diesel, Jet Fuel, Fuel Oil, Asphalt, Sulphur
+
=== Products Produced ===
Ongoing Projects
+
* LPG, Gasoline, Diesel, Jet Fuel, Fuel Oil, Asphalt, Sulphur
 +
===  Projects ===
 
-
 
-
Other Information
+
=== Other Information ===
 
-
 
-
History
+
=== History ===
1963 - Refinery commissioned
+
* 1963 - Refinery commissioned
1967 - Asphalt Unit commissioned
+
* 1967 - Asphalt Unit commissioned
1969 - Gas Oil Hydrodesulfurization & Hydrogen Units added
+
* 1969 - Gas Oil Hydrodesulfurization & Hydrogen Units added
1977 - Residuum Hydrodesulfurization & Hydrogen Units commissioned
+
* 1977 - Residuum Hydrodesulfurization & Hydrogen Units commissioned
2006 - Fire and explosion in the desulfurization unit
+
* 2006 - Fire and explosion in the desulfurization unit
2010 - Nameplate capacity reduced by 20,000 to 220,000 bbl/day
+
* 2010 - Nameplate capacity reduced by 20,000 to 220,000 bbl/day
2011 - Refinery fire occurs after an earthquake
+
* 2011 - Refinery fire occurs after an earthquake
2012 - Restart of CDU damaged in the fire
+
* 2012 - Restart of CDU damaged in the fire
Relevant Links
+
* 2017 - Capacity reduced to 177,000
Refinery Webpage
+
===  Links ===
Japanese Refining Capacities
+
# [http://www.cosmo-oil.co.jp/eng/company/chiba.html Refinery Webpage]
Chiyoda Crude Distillation Units
+
# [http://www.paj.gr.jp/english/statis/data/08/精製設備一覧(2010)E.xls Japanese Refining Capacities]
Chiyoda Blown Asphalt Bitumen Units
+
# [[Chiyoda Crude Distillation Units]]
Chiyoda Residuum Hydrodesulfurization Units
+
# [[Chiyoda Blown Asphalt Bitumen Units]]
Chiyoda Vacuum Gas Oil Hydrodesulfurization Units
+
# [[Chiyoda Residuum Hydrodesulfurization Units]]
Chiyoda Hydrogen Manufacturing Units
+
# [[Chiyoda Vacuum Gas Oil Hydrodesulfurization Units]]
Chiyoda Sulfur Recovery Units
+
# [[Chiyoda Hydrogen Manufacturing Units]]
Chiyoda H2S Removal Units With Amine
+
# [[Chiyoda Sulfur Recovery Units]]
Chiyoda Sour Water Stripping Units
+
# [[Chiyoda H2S Removal Units With Amine]]
Reduction of CDU Nameplate Capacity
+
# [[Chiyoda Sour Water Stripping Units]]
Preparations for Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
+
# [http://killajoules.wikidot.com/archive:reduction-of-cdu-nameplate-capacity Reduction of CDU Nameplate Capacity]
Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
+
# [http://killajoules.wikidot.com/blog:2258 Preparations for Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery]
Preparations to Resume Operation of the #1 CDU at Chiba Refinery Following Completion of the Safety Inspection
+
# [http://killajoules.wikidot.com/blog:2296 Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery]
Cosmo Oil, Implementation of Restructuring of Refinery Supply
+
# [http://killajoules.wikidot.com/blog:2390 Preparations to Resume Operation of the #1 CDU at Chiba Refinery Following Completion of the Safety Inspection]
 +
# [http://killajoules.wikidot.com/blog:4415 Cosmo Oil, Implementation of Restructuring of Refinery Supply]
 +
# [http://killajoules.wikidot.com/archive:refining-optimization-cosmo-oil Refining Optimization]
 +
 
 +
[[Category:Refinery]]
 +
[[Category:Japan]]

Latest revision as of 14:15, 29 March 2020

Summary Information

  • Ownership: Cosmo Oil
  • Website: http://www.cosmo-oil.co.jp/
  • Location: Chiba, Japan
  • Capacity: 7.9 million tons/annum & 177,000 bbl/day
  • Nelson Complexity:
  • Refining Depth:

Refining Units

  • Atmospheric Distillation 75,000 bpd + 102,000 bpd
  • Vacuum Distillation Unit 20,000 bpd + 60,000 bpd
  • Prefractionator Unit 23,000 bpd
  • Catalytic Reforming Unit 11,500 bpd + 25,000 bpd
  • Reformate Splitter 9,000 bpd + 20,000 bpd
  • Fluid Catalytic Cracking Unit 40,000 bpd
  • FCC Gasoline Hydrodesulfurization Unit 24,000 bpd
  • Hydrodesulfurization Units 8,000 bpd + 26,000 bpd + 55,000 bpd + 50,000 bpd
  • Isomerization Unit 6,000 bpd
  • Vacuum Gas Oil Hydrodesulfurization Unit 35,000 bpd
  • Hydrogen Recovery by Membranes Separation System Unit 331,200 m³N / day
  • Fuel Oil Hydrodesulfurization Unit 36,000 bpd + 36,000 bpd
  • No.1 Hydrogen Producing Unit 648,000 m³N / day
  • No.10·20 Hydrogen Producing Unit 880,000 m³N / day × 2
  • Sulfur Recovery Unit(With Tail Gas Treating Unit) 150 t / day × 3
  • Blown Asphalt Unit 3,600 t / month

Terminal Capacity

  • Crude Oil: (13units) 930,000kl
  • Finished Product /Semi-processed Product Tanks (119units) 1,490,000kl
  • Lubricating Oil Tanks (66units) 24,000kl
  • Sulfur Tanks (2units) 13,200kl
  • Asphalt Tanks (20units) 28,000kl
  • LPG Tanks (23units) 52,700kl

Crude Supply

  • Crude is primarily supplied from the Middle East, including UAE, S Arabia, Qatar, Iran & Kuwait

Products Produced

  • LPG, Gasoline, Diesel, Jet Fuel, Fuel Oil, Asphalt, Sulphur

Projects

-

Other Information

-

History

  • 1963 - Refinery commissioned
  • 1967 - Asphalt Unit commissioned
  • 1969 - Gas Oil Hydrodesulfurization & Hydrogen Units added
  • 1977 - Residuum Hydrodesulfurization & Hydrogen Units commissioned
  • 2006 - Fire and explosion in the desulfurization unit
  • 2010 - Nameplate capacity reduced by 20,000 to 220,000 bbl/day
  • 2011 - Refinery fire occurs after an earthquake
  • 2012 - Restart of CDU damaged in the fire
  • 2017 - Capacity reduced to 177,000

Links

  1. Refinery Webpage
  2. Japanese Refining Capacities
  3. Chiyoda Crude Distillation Units
  4. Chiyoda Blown Asphalt Bitumen Units
  5. Chiyoda Residuum Hydrodesulfurization Units
  6. Chiyoda Vacuum Gas Oil Hydrodesulfurization Units
  7. Chiyoda Hydrogen Manufacturing Units
  8. Chiyoda Sulfur Recovery Units
  9. Chiyoda H2S Removal Units With Amine
  10. Chiyoda Sour Water Stripping Units
  11. Reduction of CDU Nameplate Capacity
  12. Preparations for Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
  13. Start-Up of Crude Distillation Unit (CDU) at Chiba Refinery
  14. Preparations to Resume Operation of the #1 CDU at Chiba Refinery Following Completion of the Safety Inspection
  15. Cosmo Oil, Implementation of Restructuring of Refinery Supply
  16. Refining Optimization