Difference between revisions of "Chiba Kyokuto Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | Ownership: Kyokuto, (Exxon Mobil Co. & Mitsui Petrochemical Co., Ltd.) | + | * Ownership: Kyokuto, (Exxon Mobil Co. & Mitsui Petrochemical Co., Ltd.) |
− | Website: http://kpi.co.jp/ | + | * Website: http://kpi.co.jp/ |
− | Location: Chiba, Japan | + | * Location: Chiba, Japan |
− | Capacity: 7.5 million tons/annum & 152,000m bbl/day | + | * Capacity: 7.5 million tons/annum & 152,000m bbl/day |
− | Nelson Complexity: | + | * Nelson Complexity: |
− | Refining Depth: | + | * Refining Depth: |
− | Brief Description | + | === Brief Description === |
− | A medium sized, medium complexity refinery | + | * A medium sized, medium complexity refinery |
− | Refining Units | + | === Refining Units === |
− | Atmospheric Distillation, 175.000 | + | * Atmospheric Distillation, 175.000 |
− | Vacuum Crude Oil Distillation, 83.000 | + | * Vacuum Crude Oil Distillation, 83.000 |
− | Catalytic Cracking, 34.000 | + | * Catalytic Cracking, 34.000 |
− | Hydro-Cracking, 40.000 | + | * Hydro-Cracking, 40.000 |
− | Catalytic Reforming, 28.000 | + | * Catalytic Reforming, 28.000 |
− | Naphtha Desulfurizaton, 28.000 | + | * Naphtha Desulfurizaton, 28.000 |
− | "FCCG Desulfurization", 14.000 | + | * "FCCG Desulfurization", 14.000 |
− | Middle Distillate Desulfurization, 83.500 | + | * Middle Distillate Desulfurization, 83.500 |
− | Terminal Capacity | + | === Terminal Capacity === |
− | Crude Oil: 1,100,000 kl | + | * Crude Oil: 1,100,000 kl |
− | Refined Products: 1,510,000 kl | + | * Refined Products: 1,510,000 kl |
− | Crude Supply | + | === Crude Supply === |
− | + | * | |
− | Products Produced | + | === Products Produced === |
− | LPG, Gasoline, Jet Fuel, Diesel | + | * LPG, Gasoline, Jet Fuel, Diesel |
− | Ongoing Projects | + | === Ongoing Projects === |
− | - | + | * - |
− | Other Information | + | === Other Information === |
− | - | + | * - |
− | History | + | === History === |
− | 1968 - Refinery commissioned with 60,000 bpd capacity | + | * 1968 - Refinery commissioned with 60,000 bpd capacity |
− | 1972 - Capacity increased to 100,000 bpd | + | * 1972 - Capacity increased to 100,000 bpd |
− | 1974 - Capacity increased to 150,000 bpd | + | * 1974 - Capacity increased to 150,000 bpd |
− | 1983 - Hydrocracker and hydrogen unit commissioned | + | * 1983 - Hydrocracker and hydrogen unit commissioned |
− | 2014 - 23,000 bpd Reduction in capacity announced | + | * 2014 - 23,000 bpd Reduction in capacity announced |
+ | |||
=== Links === | === Links === | ||
# [http://kpi.co.jp/facilities/joryutou.html Refinery Units], (Japanese) | # [http://kpi.co.jp/facilities/joryutou.html Refinery Units], (Japanese) | ||
# [http://killajoules.wikidot.com/blog:5046 TonenGeneral Group to Optimize Operations] | # [http://killajoules.wikidot.com/blog:5046 TonenGeneral Group to Optimize Operations] | ||
# [[Toyo Refinery References]] | # [[Toyo Refinery References]] |
Revision as of 09:13, 25 January 2022
Contents
Summary Information
- Ownership: Kyokuto, (Exxon Mobil Co. & Mitsui Petrochemical Co., Ltd.)
- Website: http://kpi.co.jp/
- Location: Chiba, Japan
- Capacity: 7.5 million tons/annum & 152,000m bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
- A medium sized, medium complexity refinery
Refining Units
- Atmospheric Distillation, 175.000
- Vacuum Crude Oil Distillation, 83.000
- Catalytic Cracking, 34.000
- Hydro-Cracking, 40.000
- Catalytic Reforming, 28.000
- Naphtha Desulfurizaton, 28.000
- "FCCG Desulfurization", 14.000
- Middle Distillate Desulfurization, 83.500
Terminal Capacity
- Crude Oil: 1,100,000 kl
- Refined Products: 1,510,000 kl
Crude Supply
Products Produced
- LPG, Gasoline, Jet Fuel, Diesel
Ongoing Projects
- -
Other Information
- -
History
- 1968 - Refinery commissioned with 60,000 bpd capacity
- 1972 - Capacity increased to 100,000 bpd
- 1974 - Capacity increased to 150,000 bpd
- 1983 - Hydrocracker and hydrogen unit commissioned
- 2014 - 23,000 bpd Reduction in capacity announced