Difference between revisions of "Chiba Kyokuto Refinery"

From A Barrel Full
Jump to navigation Jump to search
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
Ownership: Kyokuto, (Exxon Mobil Co. & Mitsui Petrochemical Co., Ltd.)
+
* Ownership: Kyokuto, (Exxon Mobil Co. & Mitsui Petrochemical Co., Ltd.)
Website: http://kpi.co.jp/
+
* Website: http://kpi.co.jp/
Location: Chiba, Japan
+
* Location: Chiba, Japan
Capacity: 7.5 million tons/annum & 152,000m bbl/day
+
* Capacity: 7.5 million tons/annum & 152,000m bbl/day
Nelson Complexity:
+
* Nelson Complexity:
Refining Depth:
+
* Refining Depth:
Brief Description
+
=== Brief Description ===
A medium sized, medium complexity refinery
+
* A medium sized, medium complexity refinery
Refining Units
+
=== Refining Units ===
Atmospheric Distillation, 175.000
+
* Atmospheric Distillation, 175.000
Vacuum Crude Oil Distillation, 83.000
+
* Vacuum Crude Oil Distillation, 83.000
Catalytic Cracking, 34.000
+
* Catalytic Cracking, 34.000
Hydro-Cracking, 40.000
+
* Hydro-Cracking, 40.000
Catalytic Reforming, 28.000
+
* Catalytic Reforming, 28.000
Naphtha Desulfurizaton, 28.000
+
* Naphtha Desulfurizaton, 28.000
"FCCG Desulfurization", 14.000
+
* "FCCG Desulfurization", 14.000
Middle Distillate Desulfurization, 83.500
+
* Middle Distillate Desulfurization, 83.500
Terminal Capacity
+
=== Terminal Capacity ===
Crude Oil: 1,100,000 kl
+
* Crude Oil: 1,100,000 kl
Refined Products: 1,510,000 kl
+
* Refined Products: 1,510,000 kl
Crude Supply
+
=== Crude Supply ===
-
+
*
Products Produced
+
=== Products Produced ===
LPG, Gasoline, Jet Fuel, Diesel
+
* LPG, Gasoline, Jet Fuel, Diesel
Ongoing Projects
+
=== Ongoing Projects ===
-
+
* -
Other Information
+
=== Other Information ===
-
+
* -
History
+
=== History ===
1968 - Refinery commissioned with 60,000 bpd capacity
+
* 1968 - Refinery commissioned with 60,000 bpd capacity
1972 - Capacity increased to 100,000 bpd
+
* 1972 - Capacity increased to 100,000 bpd
1974 - Capacity increased to 150,000 bpd
+
* 1974 - Capacity increased to 150,000 bpd
1983 - Hydrocracker and hydrogen unit commissioned
+
* 1983 - Hydrocracker and hydrogen unit commissioned
2014 - 23,000 bpd Reduction in capacity announced
+
* 2014 - 23,000 bpd Reduction in capacity announced
 +
 
 
=== Links ===
 
=== Links ===
 
# [http://kpi.co.jp/facilities/joryutou.html Refinery Units], (Japanese)
 
# [http://kpi.co.jp/facilities/joryutou.html Refinery Units], (Japanese)
 
# [http://killajoules.wikidot.com/blog:5046 TonenGeneral Group to Optimize Operations]
 
# [http://killajoules.wikidot.com/blog:5046 TonenGeneral Group to Optimize Operations]
 
# [[Toyo Refinery References]]
 
# [[Toyo Refinery References]]

Revision as of 09:13, 25 January 2022

Summary Information

  • Ownership: Kyokuto, (Exxon Mobil Co. & Mitsui Petrochemical Co., Ltd.)
  • Website: http://kpi.co.jp/
  • Location: Chiba, Japan
  • Capacity: 7.5 million tons/annum & 152,000m bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

  • A medium sized, medium complexity refinery

Refining Units

  • Atmospheric Distillation, 175.000
  • Vacuum Crude Oil Distillation, 83.000
  • Catalytic Cracking, 34.000
  • Hydro-Cracking, 40.000
  • Catalytic Reforming, 28.000
  • Naphtha Desulfurizaton, 28.000
  • "FCCG Desulfurization", 14.000
  • Middle Distillate Desulfurization, 83.500

Terminal Capacity

  • Crude Oil: 1,100,000 kl
  • Refined Products: 1,510,000 kl

Crude Supply

Products Produced

  • LPG, Gasoline, Jet Fuel, Diesel

Ongoing Projects

  • -

Other Information

  • -

History

  • 1968 - Refinery commissioned with 60,000 bpd capacity
  • 1972 - Capacity increased to 100,000 bpd
  • 1974 - Capacity increased to 150,000 bpd
  • 1983 - Hydrocracker and hydrogen unit commissioned
  • 2014 - 23,000 bpd Reduction in capacity announced

Links

  1. Refinery Units, (Japanese)
  2. TonenGeneral Group to Optimize Operations
  3. Toyo Refinery References